E41 Worked finishes to in situ concrete
150 FINISHING
• Timing: Carry out at optimum times in relation to setting and hardening of
concrete.
• Prohibited treatments to concrete surfaces:
- Wetting to assist surface working.
- Sprinkling cement.
230 BRUSHED FINISH
• Surface on completion: Light, even texture.
310 SMOOTH FLOATED FINISH
• Surface on completion: Even, with no ridges or steps.
320 TROWELLED FINISH
• Surface on completion: Uniform, smooth but not polished, free from trowel marks
and blemishes, and suitable to receive specified flooring material.
330 TROWELLED FINISH FOR WEARING SURFACES
• Surface on completion: Uniform and smooth, free from trowel marks and blemishes.
530 SLIP RESISTANCE TESTING OF WEARING SURFACES
• Test: To BS 7976-2 using a Transport Research Laboratory (TRL) Pendulum.
- Timing: Give adequate notice.
• Test results: Submit, inclusive of slip resistance values (pendulum test value [PTV]), in
the wet and dry states.