E41 Worked finishes to in situ concrete

  150 FINISHING
        • Timing: Carry out at optimum times in relation to setting and hardening of
            concrete.
        • Prohibited treatments to concrete surfaces:
             - Wetting to assist surface working.
             - Sprinkling cement.

  230 BRUSHED FINISH
        • Surface on completion: Light, even texture.

  310 SMOOTH FLOATED FINISH
        • Surface on completion: Even, with no ridges or steps.

  320 TROWELLED FINISH
        • Surface on completion: Uniform, smooth but not polished, free from trowel marks
            and blemishes, and suitable to receive specified flooring material.

  330 TROWELLED FINISH FOR WEARING SURFACES
        • Surface on completion: Uniform and smooth, free from trowel marks and blemishes.

  530 SLIP RESISTANCE TESTING OF WEARING SURFACES
        • Test: To BS 7976-2 using a Transport Research Laboratory (TRL) Pendulum.
             - Timing: Give adequate notice.
        • Test results: Submit, inclusive of slip resistance values (pendulum test value [PTV]), in
            the wet and dry states.