Page 241 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 241

650 LAYING UNDERLAY
      • Handling: Prevent tears and punctures.
      • Laying: Butt jointed onto a dry substrate.
          - Fixing edges: With aluminium or galvanized steel staples or 20 x 3 mm extra large
             head clout nails.
          - Do not lay over eaves and drip/ step aluminium underlaps.
      • Ventilation paths: Do not obstruct.
      • Protection: Keep dry and cover with aluminium at the earliest opportunity.

          FIXING

710 FIXINGS FOR CLIPS
      • Nails to timber substrates: Aluminium to BS 1202-3 for aluminium clips. Stainless steel
          (austenitic) for stainless steel clips.
          - Shank type: Annular ringed or helical threaded.
          - Shank diameter: Not less than 2.65 mm.
          - Head: Flat.
          - Length: Not less than 25 mm or equal to substrate thickness.
      • Screws to concrete/ masonry substrates: Sherardized or zinc plated steel to BS 1210,
          table 2, or aluminium to BS 1210, table 5 for aluminium clips. Stainless steel
          (austenitic) screws to BS 1210, table 4 for stainless steel clips.
          - Diameter: Not less than 3.35 mm.
          - Length: Not less than 25 mm.
          - Washers and plastic plugs: Compatible with screws.
      • Screws to composite metal decks: Self tapping, as recommended by the deck and
          aluminium manufacturer/ supplier for aluminium or stainless steel clips.

750 CLIPS FOR FLASHINGS/ CROSS JOINTS
      • Material: Cut from same alloy and thickness as that being secured.
      • Dimensions:
          - Width: Not less than 50 mm.
          - Length: Sufficient to suit detail.
      • Fixing: Secure each clip to substrate with two fixings, not more than 50 mm from
          edge of strip/ sheet being fixed.

760 CONTINUOUS CLIPS
      • Material: Cut from same alloy and thickness as that being secured.
      • Dimensions:
          - Width: Sufficient to suit detail.
          - Length: Not more than 1.8 m.
      • Fixing: To substrate at 150 mm centres. Welt edge of strip/ sheet being fixed to
          continuous clip and dress down.

770 WEDGE FIXING INTO JOINTS/ CHASES
      • Joint/ chase: Rake out to a depth of not less than 25 mm.
      • Aluminium: Fold 25 mm into joint/ chase with a waterstop welted end.
          - Fixing: Aluminium wedges at not more than 450 mm centres, at every change of
             direction, and with at least two for each piece of aluminium.
      • Sealant: Contractor's choice.
          - Application: As section Z22.

RotF generic (intermediate) NBS 2014  6118-AEW-XX-XX-NBS-A-01
   236   237   238   239   240   241   242   243   244   245   246