Page 365 - McD_6118-AEW-XX-XX-NBS-A-001_Neat
P. 365

215 SURFACE HARDNESS OF SUBSTRATES TO RECEIVE POLYMER MODIFIED WEARING

SCREEDS

• General: Substrates must restrain stresses that occur during setting and hardening

of wearing screeds.

• Test for surface hardness: To BS EN 12504-2 using a rebound hammer with

compliance values selected from the following:

Screed thickness                      Rebound hammer value

_______________________________________________

15 mm or less                         Greater than 25

Greater than 15 mm                    Greater than 30

_______________________________________________

• Report: Submit details of areas where substrates surface hardness does not comply

with these values.

220 PROPRIETARY LEVELLING/WEARING SCREEDS
      • General: Materials, mix proportions, mixing methods, minimum/maximum
          thicknesses and workmanship must be in accordance with recommendations of
          screed manufacturer.
      • Standard: To BS 8204-3.

250 CONDUITS UNDER FLOATING SCREEDS
      • Haunching: Before laying insulation for floating screeds, haunch up in 1:4
          cement:sand on both sides of conduits.

251 CONDUITS CAST INTO OR UNDER SCREEDS
      • Reinforcement: Overlay with reinforcement selected from:
          - 500 mm wide strip of steel fabric to BS 4483, reference D49, or
          - Welded mesh manufactured in rolls from mild steel wire minimum 1.5 mm
             diameter to BS 1052, mesh size 50 x 50 mm.
      • Placing reinforcement: Mid depth between top of conduit and the screed surface.
          - Width of reinforcement (minimum): 300 mm.
      • Screed cover over conduit (minimum): 25 mm.

260 FULLY BONDED CONSTRUCTION
      • Preparation: Generally in accordance with BS 8204-1.
      • Removing mortar matrix: Shortly before laying screed, expose coarse aggregate
          over entire area of hardened substrate.
      • Texture of surface: Suitable to accept screed and achieve a full bond over
          complete area.
      • Bonding coat: Manufacturer's standard.

270 PARTIALLY BONDED CONSTRUCTION
      • Preparation: Generally in accordance with BS 8204-1.
      • Substrate surface: Brushed finish with no surface laitance.
          - Texture of surface: Suitable to accept screed and achieve a bond over
             complete area.
      • Bonding coat: Manufacturer's standard.

RotF generic (intermediate) NBS 2014                        6118-AEW-XX-XX-NBS-A-01
   360   361   362   363   364   365   366   367   368   369   370