380 GREASE TRAPS AND CONVERTERS
      • Standards: In accordance with BS EN 1825-1 and to BS EN 1825-2 and Kitemark or
          Agrément certified.
      • Manufacturer: as CDM Partnership performance sepcification.
          - Product reference: as CDM Partnership performance sepcification.
      • Accessories:
          - Enzyme dosing control unit;
          - Filters; and
          - Lid.

385 MASKING PLATES
      • Manufacturer: Contractor's choice.
          - Product reference: Contractor's choice.
      • Material and finish: Plastics, self finish.
      • Fixing: Integral clamping screws.

          EXECUTION

601 INSTALLATION GENERALLY
      • Standard: To BS EN 12056-5.
      • Components: From the same manufacturer for each type of pipework.
      • Electrolytic corrosion: Avoid contact between dissimilar metals where corrosion
          may occur.
      • Plastics and galvanized steel pipes: Do not bend.
      • Allowance for thermal and building movement: Provide and maintain clearance
          as fixing and jointing proceeds.
      • Concealed or inaccessible surfaces: Decorate before starting work specified in this
          section.
      • Protection:
          - Purpose made temporary caps: Fit to prevent ingress of debris.
          - Access covers, cleaning eyes and blanking plates: Fit as the work proceeds.

605 PIPE ROUTES
      • General: The shortest practical, with as few bends as possible.
          - Bends in wet portion of soil stacks: Not permitted.
          - Routes not shown on drawings: Submit proposals before commencing work.

610 FIXING PIPEWORK
      • Pipework: Fix securely plumb and/ or true to line. Fix discharge stack pipes at or
          close below socket collar or coupling.
      • Branches and low gradient sections: Fix with uniform and adequate falls to drain
          efficiently.
      • Externally socketed pipes and fittings: Fix with sockets facing upstream.
      • Additional supports: Provide as necessary to support junctions and changes in
          direction.
      • Vertical pipes: Provide a load bearing support not less than every storey level.
          Tighten fixings as work proceeds so that every storey is self supporting.
      • Wall and floor penetrations: Isolate pipework from structure, e.g. with pipe sleeves.
          - Masking plates: Fix at penetrations if visible in the finished work.
      • Expansion joint sockets: Fix rigidly to the building.
      • Fixings: Allow the pipe to slide.