Page 88 - McD_ROTF DRAINAGE & PIPED SERVICES_Neat
P. 88

Drainage & Piped Services Standard Specification
Version 2014-1

Testing of ancillary components in below ground drainage monitoring and control systems type G
Components: Attenuation chambers.
Testing:

                 Standard: To BS EN 1610.
                 Tests: Exfiltration and Infiltration.
                 Method: Testing with water (method W).

Documentation type G
Operating and maintenance instructions:

                 Scope: Submit for the system giving optimum settings for controls.
                 Product information: Include product description, date of purchase, performance
                 characteristics, application (suitability for use), method of operation and control, and
                 cleaning and maintenance requirements.
                 Format: Paper copy and electronic
                 Number of copies: Three.
Record drawings:
                 Content: Location, size and route of below ground drainage services and Location of outlets.
                 Format: A1 paper print and Electronic.
                 Number of copies: Three.
Submittal date: At handover.

                           3 / 56

McDonalds Restaurants Ltd
   83   84   85   86   87   88   89   90   91   92   93