3.1  Make suitable arrangements for managing
                                                                                                 the project

                                                         What do you have to do                  As the client, you must make suitable arrangements to ensure that, throughout
                                                         in the pre-construction                 the planning, design and construction of a project, adequate consideration is
                                                                                                 given to the health, safety and welfare of all those affected and involved in the
                                                 3 phase?                                        construction work.

                                                                                                 Your arrangements should be appropriate to the nature of the work and enable
                                                                                                 other duty holders to carry out their work without risk to themselves or anyone
                                                                                                 else who may be affected.

                                                                                                 The management arrangements should:
                                                                                                 •  include requirements for how the project is to be run, taking into account any
                                                                                                   risks to the public
                                                                                                 •  explain how you will select and appoint designers and contractors to ensure
                                                                                                   they have the necessary capabilities for the work they are required to do
                                                                                                 •  allocate sufficient time and resources to each stage of the project, from
                                                                                                   concept through to completion
                                                                                                 •  ensure suitable welfare facilities are in place before works start.
                                                                                                 For projects involving more complex work and significant risks, the
          The pre-construction phase is defined as any period during which                       management arrangements will also need to cover:
          design or preparatory work is carried out for a project.                               •  what is expected of the design team to ensure that they consider health and
                                                                                                   safety risks for the construction phase, as well as when maintaining and using
          As the client, you must ensure that construction work is properly                        the building once it is built
          planned, resourced and managed to protect the health, safety and                       •  the arrangements for procuring the design and construction team, including
          welfare of those carrying out work on, or who may be affected by,                        establishing that designers and contractors are adequately trained, and have
          your project.                                                                            the right skills and experience of health and safety
                                                                                                 •  the arrangements for monitoring designers’ and contractors’ performance,
                                                                                                   for example by arranging progress meetings with the principal designer
                                                                                                   and principal contractor to ensure that the project runs in line with your
                                                                                                   expectations and meets legal requirements. The meetings also give you the
                                                                                                   opportunity to take action where that is not the case
                                                                                                 •  the format for the health and safety file or a building manual that incorporates
                                                                                                   the health and safety file.


         Industry guidance for clients                                                                                                                          9



   CSK-CDM2015-Clients-Int.indd   9                                                                                                                            25/03/2015   13:30
   4   5   6   7   8   9   10   11   12   13   14