DESIGN





       D3 Drive Thru (Exterior)






       D3.7 Building Aesthetics and Signage

       Generally, drive thru  buildings have been            -  White signage panels should be set out above
       developed using a simple architectural                  the drive thru booth windows.
       language and palette of materials. Single storey
       with brick slips or render solid sections and PPC     -  The section of roof between drive thru booths
       aluminium openings for doors and windows                must be one style only.
       topped with a projecting mansard roof.
                                                             -  The  roof  styles should alternate  around  the
       When  extending  existing  buildings, the  form,        building.
       layout and material of the proposed extension
       should mimic the existing rather than contrast.       -  Only  solid green  sections  of  roofs  should  be
       This includes the extension and principles of the       used around corners.
       roof,  which should be amended to follow the
       new building perimeter post extension.                -  Small  sections  of  roofing  styles  should  be
                                                               avoided to prevent clutter.
       Buildings  in prominent locations may be
       considered  for  ‘folded  roof’  cladding.  Rather    -  Where redundant order  booths (booth 3)
       than a traditional, grey slate or decra roof tile       are / have been removed, the corner of the
       the mansard roofs are overclad with composite           building should be treated as a timber shield.
       aluminium panels in either solid green or timber        Individual  vertical  timbers  70x70  douglas  fir,
       effect louver panels. When developing a folded          treated  with  sickens  cetol  filter  7  plus  E8  40
       roof design, the following principles should be         45T.
       followed:
                                                             -  Cleaning procedures and equipment are
                                                               available via the M+R website.