Page 38 - P11110_AEW_XX_XX_PP_A_0001_(P02)_CO-OP LEAN STORE DESIGN MANUAL
P. 38
B
B.8 Costa pod provision
General Description of Service Requirement
Service Installation Specification
See below overview of the costa pod provision required at a lean store.
•
The Costa Express Station requires a water supply, electricity and waste discharge pipe
work.
•
The services are to be installed at a pre-set height and location in order to be fed into the rear of
For full assembly information please refer to detailed document: MK2/MK3
the concession through a rectangular hole measuring approximately 500mm x 300mm.
‘Costa Coffee Service Installation Specification MK2 and MK3’ IMPORTANT
Services Location When Installing From the Ceiling
It is the responsibility of the site to install these services to this specification.
Services Location When Installing From the Ceiling
Viewed from Front of Station.
View Viewed from Front of Station.
A
32mm Plastic Waste.
32mm Plastic Waste STORE CEILING
terminated above ceiling
in recommended fittings
listed below. Complete with
¾” Internal Diameter GENERAL DIMENSIONS
flexible pipe run down
wall or column (if used) OF COSTA
and 1 metre left protruding EXPRESS STATION
Watch out for stairs, lifts
towards the unit (or from IMPORTANT!
and doors
front of column) Be aware that you must provide
enough space for the Costa
Electrical outlet 13 amp Express Station when the doors
socket positioned at are OPEN and CLOSED.
2200mm from FFL. Dimensions for both situations
Central to unit width or are below.
on rear of column if fitted.
Height
Doors open or closed 1980mm.
Width
Doors closed 800mm.
Doors open 900mm.
Termination of Cold Water Depth Front to Back
Supply at 660mm from FFL Doors closed 1000mm
and central. This should Doors open 1700mm
protrude forwards no more
than 50mm from the rear
wall or gondola end. ADDITIONAL
CLEARANCE
Pressure reducing valve Sides 17.5mm each side
(35mm total)
set to 3 bar
Top 20mm
Rear 50mm
Washing machine Waste in ¾” internal
tap diameter flexible
plastic pipe. Leave 2
metres spare for final
connection.
Store Entrance
Services rear entry area.
Size 500 wide x 300 high.
Positioned centrally across unit and
400mm from FFL.
Part plan View A Costa Pod Services 5 of 14
Above shows the proximity of the Costa pod to the customer entrance and egress Above shows the location of the drainage pop-up for the Costa pod Extract page 7 from Costa Coffee Service Installation Specification MK2 and MK3
MK2/MK3 | pg 7
B.8 Costa pod provision 1.0 25th March 2019