Page 68 - P11110_AEW_XX_XX_PP_A_0001_(P02)_CO-OP LEAN STORE DESIGN MANUAL
P. 68
B
B.12 DDA WC
Do:
WORK IN PROGRESS WORK IN PROGRESS
Grab rail to door as DDA requirements 2nd hand basin to WC as DDA requirements To be added as the manual develops To be added as the manual develops
Don’t:
WORK IN PROGRESS WORK IN PROGRESS WORK IN PROGRESS WORK IN PROGRESS
To be added as the manual develops To be added as the manual develops To be added as the manual develops To be added as the manual develops
B.12 DDA WC 1.0 25th March 2019