Page 68 - P11110_AEW_XX_XX_PP_A_0001_(P02)_CO-OP LEAN STORE DESIGN MANUAL
P. 68

B








        B.12 DDA WC









                   Do:














                                                                                                                                     WORK IN PROGRESS                                    WORK IN PROGRESS











                   Grab rail to door as DDA requirements               2nd hand basin to WC as DDA requirements           To be added as the manual develops                  To be added as the manual develops



                   Don’t:













                               WORK IN PROGRESS                                   WORK IN PROGRESS                                   WORK IN PROGRESS                                    WORK IN PROGRESS












                   To be added as the manual develops                  To be added as the manual develops                 To be added as the manual develops                 To be added as the manual develops








         B.12 DDA WC                                                                                                     1.0                                                     25th March 2019
   63   64   65   66   67   68   69   70   71   72   73