P. 75
B
B.13 Storage area
Electrical and mechanical
Fixtures and fittings schedule
No. Item Description Supplier Specification Product code
2 Bank of 5 lockers Bunzl N/A FRN55000
1 Vogue - Stainless steel cleaners sink Main Contractor TBC TBC
1 Centre feed paper towel dispenser Bunzl White JAN55013
1 Hyco speed flow water heater Main Contractor 10 litre N/A
2 Warehouse starter bay 6 shelves each Bunzl Grey FRN55002
6 Warehouse add on bay 6 shelves each Bunzl Grey FRN55003
1 Secure steel cupboard Bunzl Grey FRN55001
Floor and wall finishes
Finish Tag Specification Supplier
Floor finish Power float concrete floor finished with diamond extra Via developer
wet look for polisher (by Clover Chemicals). Ref. 109.
No Skirting.
Wall finish 1 In order of preference, see flow chart in section A.2: Main Contractor
1. Blockwork painted silk grey RAL 7044 with satin finish.
Include 2 undercoats to neutralise and 2 top coats.
2. Dry wall partition lined to exposed walls only painted
silk grey RAL 7044 with satin finish. Include 2 undercoats
to neutralise and 2 top coats.
2 White laminate board finished Sonae B4062 Pearl White. Main Contractor
View A 3 9mm Brown ply panels Main contractor
Electrical and mechanical items to storage area
NOTE:
All pipework to be copper, unpainted, unfinished, crimped not soldered
View
A
Part plan NTS
B.13 Storage area 2.0 14th June 2019