Page 16 - LINK - HSE Client duties - CDM 2015-clients-interactive_Neat
P. 16

Annex A  CDM duty holders and their roles summarised

CDM duty holders* – who are they? Summary of role/main duties                  CDM duty holders* – who are they? Summary of role/main duties

Clients                             Make suitable arrangements for             Principal designers                 Plan, manage, monitor and
                                    managing a project. This includes                                              co-ordinate health and safety in the
Organisations or individuals for    making sure that:                          Designers appointed by the client   pre-construction phase of a project.
whom a construction project is                                                 in projects involving more than     This includes:
carried out.                        •	 other duty holders are appointed        one contractor. They can be an
                                                                               organisation or an individual with  •	 identifying, eliminating or controlling
                                    •	 sufficient time and resources are       sufficient knowledge, experience      foreseeable risks
                                      allocated.                               and ability to carry out the role.
                                                                                                                   •	 ensuring designers carry out their
                                    Clients must also make sure that:                                                duties.

                                    •	 relevant information is prepared and                                        Prepare and provide relevant
                                      provided to other duty holders                                               information to other duty holders.

                                    •	 the principal designer and principal                                        Provide relevant information to the
                                      contractor carry out their duties                                            principal contractor to help them plan,
                                                                                                                   manage, monitor and co-ordinate
                                    •	 welfare facilities are provided.                                            health and safety in the construction
                                                                                                                   phase.
Domestic clients                    Domestic clients are in scope of CDM
                                    2015 but their duties as a client are      Designers                           When preparing or modifying
People who have construction        normally transferred to:                                                       designs, eliminate, reduce or control
work carried out on their own                                                  Those who, as part of a business,   foreseeable risks that may arise
home, or the home of a family       •	 the contractor, on a single contractor  prepare or modify designs for a     during:
member, that is not done in           project                                  building or product, or prepare or
furtherance of a business, whether                                             modify designs to systems relating  •	construction
for profit or not.                  	or                                        to construction work.
                                                                                                                   	and
                                    •	 the principal contractor, on a project
                                      involving more than one contractor.                                          •	 the maintenance and use of a
                                                                                                                     building once it is built.
                                    However, the domestic client can
                                    choose to have a written agreement for                                         Provide information to other members
                                    the principal designer to carry out the                                        of the project team to help them fulfil
                                    client duties.                                                                 their duties.

Industry guidance for clients                                                                                                                               16
   11   12   13   14   15   16   17   18   19   20   21