Page 187 - ROTF DRAINAGE & PIPED SERVICES_Neat
        P. 187
     Bills of Quantity
Bill Ref Description  Adjust Quantity to suit Project.                                                                                       Qty  Unit Rate Total
CREW ROOM                                                                                                                                     1   item
               Stripping out                                                                                                                  2    nr
                                                                                                                                              2    nr
    100 Isolate drain down and remove existing sanitary ware. Seal off soil waste and vent connections. Remove                                2    nr
               wc overflow pipes. Remove local instantaneous water heaters in toilet areas (if fitted)                                        2
                                                                                                                                              2   item
               Add                                                                                                                            2   item
    101 Provide and install new wc suites                                                                                                     1   item
                                                                                                                                              1   item
    102 Provide and install new wash basins complete with contrapress tap and waste                                                               item
                                                                                                                                              1
    103 Provide and install new blending valves to wash basins                                                                                1   item
                                                                                                                                              2    nr
    104 Adapt and connect existing soil and water services to new wc's                                                                        1    nr
                                                                                                                                              1    nr
    105 Adapt and connect waste and hot & cold water services to new wash basins                                                              1
                                                                                                                                                  item
    106 Extend HWS return pipework to a location as close to the blending valve as practical                                                  2   item
               NB: The blending valve is to be as close to the basin tap as possible i.e. minimum dead leg                                    2
                                                                                                                                              2    nr
    107 Provide and install insulation to all new hot and cold water pipework                                                                 1    nr
                                                                                                                                              1    nr
    108 Extend HWS return pipework to a location as close to the wash basin blending vavle as practical                                           item
               NB: The blending valve is to be as close to the basin tap as possible i.e. minimum dead leg                                   Qty  item
PUBLIC TOILETS MALE                                                                                                                           1   Unit Rate Total
               Stripping out                                                                                                                  2
                                                                                                                                              1   item
    109 Isolate drain down and remove existing sanitary ware including McWash units. Seal off soil, waste and                                 1    nr
               water connections. Remove wc overflow pipes. Remove water supply to urinal cistern including branch                            1    nr
               connection from main run i.e. remove dead leg                                                                                  1
                                                                                                                                              1   item
               Add                                                                                                                            1   item
    110 Provide and install new wc suite                                                                                                      1   item
    111 Provide and install new wc waterless urinals                                                                                          1    nr
                                                                                                                                              1    nr
    112 Provide and install new blending valve NB: one valve to serve 2No basins in pod                                                       1   item
                                                                                                                                              1
    113 Adapt and connect existing soil and water services to new wc's                                                                        1   item
                                                                                                                                              1   item
    114 Adapt and connect waste and hot & cold water services to new 2No basin pods
                                                                                                                                              1    nr
    115 Provide and install contrapress taps and slotted waste fittings to each of 2No basins fitted                                          1   item
               within pod unit                                                                                                                    item
                                                                                                                           Contrapress Taps       item
                                                                                                                           Slotted waste          item
                                                                                                                                                  item
    116 Adapt and connect urinal outlets to existing soil pipework
    117 Provide and install insulation to all new hot and cold water pipework
    118 Extend HWS return pipework to a location as close to the wash basin blending vavle as practical
               NB: The blending valve is to be as close to the basin tap as possible i.e. minimum dead leg
Bills of Quantity
Bill Ref Description
PUBLIC TOILETS FEMALE
               Stripping out
    119 Isolate drain down and remove existing sanitary ware including McWash units. Seal off soil, waste and
               water connections. Remove wc overflow pipes. Remove water supply to urinal cistern including branch
               connection from main run i.e. remove dead leg
               Add
    120 Provide and install new wc suites
    121 Provide and install new blending valve to 1No basin pod
    122 Adapt and connect existing soil and water services to new wc's
    123 Adapt and connect waste and hot and cold water services to new one basin pod
    124 Extend HWS return pipework to a location as close to the blending valve as practical
               NB: The blending valve is to be as close to the basin tap as possible i.e. minimum dead leg
    125 Provide and install contrapress tap and slotted waste fittings to basin fitted within pod unit
                                                                                                                           Contrapress Taps
                                                                                                                           Slotted waste
    126 Provide and install insulation to all new hot and cold water pipework
DISABLED TOILET AREA
               Stripping out
    127 Isolate drain down and remove existing sanitary ware. Seal off soil, waste and water connections.
               Remove wc overflow pipes
               Add
    128 Provide and install new Doc M pack complete
    129 Provide and install new blending valve to wash basin
    130 Adapt and connect existing soil and water services to new wc's
    131 Adapt and connect waste and hot & cold water services to new wash basin
    132 Extend HWS return pipework to a location as close to the basin blending valve as practical.
               NB: The blending valve is to be located in the wc duct
KITCHEN - Wash basin / trough sink (Strike out if not applicable)
               Add
    133 Blending valve beneath basin / sink, adapt services, extend HWS return
    134 Provide contrapress tap and blanking disc to basin (if applicable)
                                                                                                                                                                   2
     	
