13. ELECTRIC LOCO SHED/KAZIPET


               SYSTEM IMPROVEMENTS


                  For  improvement  of  Greenery  area  inside  the  shed  premises,
                   around 2400 sq feet area is converted into Garden.




                  50  no’s  Smart  energy  meters  provided  in  shed  to  measure  energy
                   consumption on line.


                  Modification of Pressure Reducing Valve (PRV) in VCB.



                  Provision of in Built pressure gauge to check & trouble shoot in
                   the cases of DJ feedback fail/VCB stuck off/VCB Stuck on and
                   during schedule maintenance.




                  First  ELS  in  SCRly  devoloped    Power  module  test  kit  for  Medha
                   Traction  Converter  in-house  to  test  the  all  sub  equipment  of
                   power module.




                  In  house  development  of  Racks  to  utilize  vertical  space  inside
                   section rooms and proper material stocking.



                  2  no’s  newly  received  M&P  equipments  are  installed(  Abro
                   dynamic  balancing  machine  &    TFP  oil  filtration  plant  of  Nach
                   make)





                  No staff are overdue for Refresher  course(SSE:15, Tech:21)



                  Imparting  of  training  to  diesel  shed  staff                      to  improve  the
                   maintenance activities in WAG7 during 2022-23 is 70  staff




                  Existing  21  Conventional  Relay  based  WAG7  locos  are
                   Converted  into  Micro  processer  Based  control  system  of  V3

                   version.

                  12  conventional  locos    are    provided  with  DPWCS  system  of
                   M/s.LWT make