Page 128 - CRS Engineering
P. 128

Proforma for Joint Inspection on R. A. T.

                                                For the Year 2020 -21
             s                   Description                                         Remarks
             No
              I General Particulars of RAT
                 Name of the tank                               Chindepalli Tank
              2 District                                        Chittoor District

              3 Name of the Village and Mandal                  Chindepalli Village, Yerpedu Mandal
                 Latitude & Longitude                           Lat 13° - 43' -52" Long 79° - 36' - 44"
              5 Affected Railway Bridge and Km                  Bridge No:-70, Location 57 / 24 - 26
              6 Railway section in between stations             Yerpedu - Rachagunneri.
              7 Distance from Railway Bridge to weir            4.00 Kms from the Railway line to the tank.
                ( Along the Course of Nallah )
             II Standard Hydraulic Details
              1 Catchment Area                                 4.08 Sqmiles
              2 Capacity of the tank                            53.21 M.C.F.T
                Lowest Bed Level                                +77.18M
              •;
              i Full Tank Level ( F.T.L )                      +81.45M
              5 Maxim Water Level ( M.W.L )                    +82.35M
              6 Danger Level ( D.L )                           +82.65M
              7 Top of Bund Level ( T.B.L )                    +83.55M
              8 Top Width of the Bund                          3.00M ( Present Top Width )
              9 Side Slopes                                    AT FRONT:- 1 1/2 : 1 , AT REAR :- 2:1
             10 Area of Submergence at FTL                                          3.90 Sqm

             11 Area of Submergence at MWL                                          4.60 Sqm
             12 Are there any tanks In the Catchment of                                 NO
             13 Are these tanks also classified as RATs                                  -
             14 Names and details of these tanks                                         -
            III Surplus Weir                                                             -
              1 Number of Surplus Weirs                        Two S.W , and Two Out Let Weirs
              2 Lengths of Surplus Weir                        1) 13M, 2)25M & 1) lOM, 2) 7M.
              3 Type of Surplus Weir                           B.C WEIR
              4 Design Discharge                               4.57 Cusecs
             IV Sluices
                                                               FORE NUMBERS ONLY ( 4 Nos Only )
              1 Number of Sluices
                                                               @ 645M, @875M, @1210M, @1615M
              2 Location of Sluices
             3 Maximum designed discharge                      2.50 CUSECS
             4 functional or not                               FUNCTIONAL
             V A) Inspection details
                                                                                 <^02-2020
                )Date of Inspection
                i)NampRi Deslanation ofthe Inspection                       1) Sri. C. Willson Babu,
                                                                         Assistant Divisional Engineer ,
                                                                             South Central Railway
                                                                                   RENIGUNTA
                                                                    2) Sri. C.Adinarayana Naidu, B.Tech..
                                                                          Deputy Executive Engineer,
                                                                             Irrigation Sub Division

                                                                             3) Sri. K. Harikrishna
                                                                              Assistant Engineer,
                                                                                Irrigation Section
                                                                                    YERPEDU
   123   124   125   126   127   128   129   130   131   132   133