Page 197 - CRS Engineering
P. 197

J
                                                                                                       Page No.2 of 2
               (A) Tnsnection Details

               ri) Date of Insnection
         V
               (ii)Name and Designation oftheinspeaction details  (1) Sri  Wilson Babu
                                                              Asst. Divisional Engineer, S.C. Rly.
                                                                   RENIGUNTA              »
                                                              (2) Sri S.Venugopal, M.Tech,
                                                                    Dy.Executive Engineer,
                                                                    Irrigation Sub-Division,
                                                                     THOTTAMBEDU
                                                              (3) Sri R.Guru Raghavendra Rao,
                                                                     Assistant Engineer,
                                                                   Irrigation Section (minor)
                                                                     THOTTAMBEDU
               (iii)Iftank isqualify forRAT

       *
               (R'JTank Bund
       •—
               (i) istheTop Level ofthebund isuniform? And is
                                                                 -No-
               as perthe standards ?
               (ii) are the slopesare as per the standards ?     — No-     GO
       —
               (iv)Anyscours ofgullies areformed atD/S ofthe Small and minor gullies and rain cuts are formed at D/S of
               Bund                                           the tank bund

               fr} Surplus weir
               (i)Condition ofthesurplus weir                 Repairs to are required to surplusweir
               (ii) isthelength ofthesurplus weirisadaquate for
                                                                  -Yes-
               design discharge
               (iii)IstheDamger Level isMarked                    -Yes--
                                                              Sluice No.l is in Good Condition, and sluice No.2 requires
               [ D") Condition ofthesluice
                                                              repairs
               (E) Any past history of Breach ofthe tank and ifso
               give details
               (F) I-D- No. ofthe tank                        CH THO 008 ADEN/RU

               (G) Railway affecting Bridge No. (Kms)         56 - 51/5-7


                                                                                                     )u>
                                                                                                   ty
                              Assistant Engineer,                              Dy.l
                            Irrigation Section (Minor)                         Irrigation Sub-Division
                              thottambedu                                        THOTTAMBEDU



                                                                                    r


                                                                                    V
                                                                              Asst. Divisional Engineer,
                                                                                South Central Railway
                                                                                   RENIGUNTA
   192   193   194   195   196   197   198   199   200   201   202