EJE F(28,29) 2 3/8" 1 18 0.16 0.16 0.095 0.83 14.94 CECAF
EJE P (14,15) 2 3/8" 1 51 0.16 0.16 0.095 0.83 42.33 EL ORIGEN DEL SABOR
EJE P (15,16) 2 3/8" 1 49 0.16 0.16 0.095 0.83 40.67 CENTRO
EJE P (16,19) 3 3/8" 2 51 0.16 0.16 0.095 0.83 84.66
EJE P (23,26') 3 3/8" 1 47 0.16 0.16 0.095 0.83 39.01
EJE P (27,28) 1 3/8" 1 38 0.16 0.16 0.095 0.83 31.54
EJE S (26,26) 3 3/8" 1 8 0.16 0.16 0.095 0.83 6.64
EJE S (28,29) 3 3/8" 1 51 0.16 0.16 0.095 0.83 42.33
EJE U (20,23) 3 3/8" 1 26 0.16 0.16 0.095 0.83 21.58
EJE W (15,16) 3 3/8" 1 33 0.16 0.16 0.095 0.83 27.39 CAFETALERO
EJE W (16,19) 3 3/8" 1 51 0.16 0.16 0.095 0.83 42.33
EJE W (19,21) 3 3/8" 1 41 0.16 0.16 0.095 0.83 34.03
EJE X (23,25) 3 3/8" 1 34 0.16 0.16 0.095 0.83 28.22
EJE X (25,27) 3 3/8" 1 51 0.16 0.16 0.095 0.83 42.33
EJE X' (25,27) 3 3/8" 1 20 0.16 0.16 0.095 0.83 16.6
EJE Y (21,23) 3 3/8" 1 11 0.16 0.16 0.095 0.83 9.13
EJE Y' (16,19) 3 3/8" 3 51 0.16 0.16 0.095 0.83 126.99
EJE Y' (21,23) 3 3/8" 1 44.15 0.16 0.16 0.095 0.83 36.6445
EJE Y' (21,23) 2 3/8" 1 34 0.16 0.16 0.095 0.83 28.22
EJE Z (14,15) 2 3/8" 1 53 0.16 0.16 0.095 0.83 43.99
EJE Z (21,23) 2 3/8" 1 49 0.16 0.16 0.095 0.83 40.67
EJE Z (27,28) 2 3/8" 1 51 0.16 0.16 0.095 0.83 42.33
EJE Z (21,23) 2 3/8" 1 46 0.16 0.16 0.095 0.83 38.18 CECAF
TOTAL 1550.8965 ML
PROYECTO DE TESIS: GENERADORES GENERADORES: ESTRUCTURAL:ADMINISTRATIV
PROYECTO: CENTRO CAFETALERO O VARILLAS
EDIFICIO: INDUSTRIAL
ZONA: A.COMUNES FECHA: 20/01/2021
UBICACIÓN: POZA RICA, VERACRUZ LONGUITUD X PZA (M) LONGUITUD POR DIAMETRO (M)
CONCEPTO TIPO ° (PULG) NUM.ELEM. #PZAS A B C TOTAL 1/4 3/8
ESTRUCTURAL:ADMINISTRATIVO VARILLAS
EJE 14 (Z,P) 3 3/8" 1 4 11.55 0.2 0.2 11.95 47.8
EJE 15 (W,P) 3 3/8" 3 4 7.64 0.2 0.2 8.04 96.48
EJE 15 (W,P) 3 3/8" 1 4 6.91 0.2 0.2 7.31 29.24
EJE 16 (W,Z) 3 3/8" 1 4 7.67 0.2 0.2 8.07 32.28
EJE 18 (W,Y) 2 3/8" 1 4 5.1 0.2 5.3 21.2
EJE 19 (W,Y) 3 3/8" 1 4 7.69 0.2 0.2 8.09 32.36
EJE 20 (W,Y) 3 3/8" 1 4 2.95 0.2 0 3.15 12.6
EJE 20(P,U) 3 3/8" 1 4 4.21 0.2 0.2 4.61 18.44