Page 448 - TESIS B5
P. 448
EJE 41 (B,D) 4 3/8" 1 21 0.16 0.16 0.095 0.83 17.43 CECAF
EJE 41 (B,D) TOTAL 1192.461 ML EL ORIGEN DEL SABOR
CENTRO
CADENAS:ADMINISTRATI
GENERADORES:
PROYECTO DE TESIS: GENERADORES VO VARILLAS
PROYECTO: CENTRO CAFETALERO
EDIFICIO: INDUSTRIAL FECHA: 20/01/2021
ZONA: C.MAQUINAS LONGUITUD X PZA (M) LONGUITUD POR DIAMETRO (M)
UBICACIÓN: POZA RICA, VERACRUZ TIPO ° (PULG) NUM.ELEM. #PZAS A B C TOTAL 1/4 3/8 1/2 CAFETALERO
CONCEPTO
CADENAS:ADMINISTRATIVO VARILLAS 3 3/8" 3 4 6.67 0.2 0.2 7.07 84.84
EJE 30(F,K) 3 3/8" 5 4 8.2 0.2 0.2 8.6 172
EJE 30(K,S) 3 3/8" 2 4 6.7 0.2 0.2 7.1 56.8
EJE 32(K,Q) 3 3/8" 2 4 3.82 0.2 0.2 4.22 33.76
EJE 31(N,Q) 3 3/8" 6 4 10.63 0.2 0.2 11.03 264.72
EJE F(30,39) 3 3/8" 2 4 2 0.2 0.2 2.4 19.2
EJE G' Y N (33,34) 3 3/8" 3 4 3 0.2 0.2 3.4 40.8
EJE 30(42,45) 3 3/8" 1 4 3.54 0.2 0.2 3.94 15.76
EJE L(42,45) 3 3/8" 1 4 8.35 0.2 0.2 8.75 35
EJE 42(F,L) 3 3/8" 1 4 9.3 0.2 0.2 9.7 38.8
EJE E (40,45) 2 3/8" 1 4 9.4 0.2 0.2 9.8 39.2
EJE E (40,45) 3 3/8" 1 4 7.58 0.2 0.2 7.98 31.92 CECAF
EJE D(41,44) 2 3/8" 1 4 9.06 0.2 0.2 9.46 37.84
EJE D(36,40) 2 3/8" 1 4 4.3 0.2 0.2 4.7 18.8
EJE D(36,40) 2 3/8" 1 4 4.3 0.2 0.2 4.7 18.8
EJE D(36,40) 1 3/8" 1 4 4.75 0.2 0.2 5.15 20.6
EJE B(33,45) 1 3/8" 1 4 11.7 0.2 0.2 12.1 48.4
EJE B(33,45) 1 3/8" 1 4 11.37 0.2 0.2 11.77 47.08
EJE B(36,40) 1 3/8" 1 4 10.55 0.2 0.2 10.95 43.8
EJE B(36,40) 1 3/8" 1 4 3.6 0.2 3.8 15.2
EJE 40 (D,E) 2 3/8" 1 4 6.41 0.2 0.2 6.81 27.24
EJE 43 (D,E) 3 3/8" 1 4 7.05 0.2 7.25 29
EJE 43 (D,E) 4 3/8" 1 4 9.67 0.2 0.2 10.07 40.28
EJE 41 (B,D) 4 3/8" 1 4 4.13 0.2 0.2 4.53 18.12
EJE 41 (B,D) TOTAL 1197.96 ML
3 3/8" 3 34 0.16 0.16 0.095 0.83 84.66
EJE 30(F,K) 3 3/8" 5 41 0.16 0.16 0.095 0.83 170.15
EJE 30(K,S) 3 3/8" 2 34 0.16 0.16 0.095 0.83 56.44
EJE 32(K,Q) 3 3/8" 2 20 0.16 0.16 0.095 0.83 33.2
EJE 31(N,Q) 3 3/8" 6 54 0.16 0.16 0.095 0.83 268.92
EJE F(30,39) 3 3/8" 2 10 0.16 0.16 0.095 0.83 16.6
EJE G' Y N (33,34) 3 3/8" 3 15 0.16 0.16 0.095 0.83 37.35