Page 457 - TESIS B5
P. 457
34 S F 13.68 4 2 109.44 M2 CECAF
35 Q N 3.42 4 2 27.36 M2 EL ORIGEN DEL SABOR
36 C D 6.46 4 2 51.68 M2
37 S K 7.37 4 2 58.96 M2 CENTRO
38 K Q 6.11 4 2 48.88 M2
39 S F 13.67 4 2 109.36 M2
40 E D 3.42 4 2 27.36 M2
41 D A 9.47 4 2 75.76 M2
42 F L 8.55 4 2 68.40 M2
43 D E 6.01 4 2 48.08 M2 CAFETALERO
44 D A 3.4 4 2 27.20 M2
45 E L 13.21 4 2 105.68 M2
B 44 36 41.04 4 2 328.32 M2
D 44 36 17.11 4 2 136.88 M2
E 45 37 16.09 4 2 128.72 M2
F 45 30 22.88 4 2 183.04 M2
G 42 45 2.72 4 2 21.76 M2
G' 42 45 2.23 4 2 17.84 M2
K 30 39 19.46 4 2 155.68 M2
L 42 45 3.54 4 2 28.32 M2
N 30 35 3 4 2 24.00 M2
Q 31 39 12.59 4 2 100.72 M2
S 30 39 19.27 4 2 154.16 M2 CECAF
TOTAL 2287.04 M2
PRELIMINARES:
GENERADORES:
PROYECTO DE TESIS: GENERADORES REPELLADO EN MUROS
PROYECTO: CENTRO CAFETALERO
EDIFICIO: INDUSTRIAL FECHA: 20/01/2021
ZONA: C.MAQUINAS TRAMO
UBICACIÓN: POZA RICA, VERACRUZ EJE DE A LARGO ALTURA #VECES TOTAL UNIDAD OBSERVACIÓN
CONCEPTO 30 S F 13.47 4 2 107.76 M2
PRELIMINARES: REPELLADO EN MUROS 31 Q N 3.42 4 2 27.36 M2
32 S K 7.4 4 2 59.20 M2
33 Q K 6.89 4 2 55.12 M2
34 S F 13.68 4 2 109.44 M2
35 Q N 3.42 4 2 27.36 M2
36 C D 6.46 4 2 51.68 M2
37 S K 7.37 4 2 58.96 M2
38 K Q 6.11 4 2 48.88 M2
39 S F 13.67 4 2 109.36 M2
40 E D 3.42 4 2 27.36 M2