EJE A(25,29) 1 3/8" 1 4 9.11 9.11 36.44 CECAF
EJE A(25,29) 1 3/8" 1 4 9.21 9.21 36.84 EL ORIGEN DEL SABOR
EJE A(25,29) 1 3/8" 1 4 9.15 9.15 36.6 CENTRO
EJE A(25,29) 1 3/8" 1 4 3.38 3.38 13.52
EJE 25(E,B) 1 3/8" 1 4 10.59 10.59 42.36
EJE 25(E,B) 1 3/8" 2 4 10.79 10.79 86.32
EJE 25(E,B) 1 3/8" 1 4 2.93 2.93 11.72
TOTAL 304.96 ML
EJE A(25,29) 5 3/8" 1 52 0.16 0.16 0.095 0.83 43.16
EJE A(25,29) 5 3/8" 1 46 0.16 0.16 0.095 0.83 38.18 CAFETALERO
EJE A(25,29) 5 3/8" 1 47 0.16 0.16 0.095 0.83 39.01
EJE A(25,29) 5 3/8" 1 46 0.16 0.16 0.095 0.83 38.18
EJE A(25,29) 5 3/8" 1 17 0.16 0.16 0.095 0.83 14.11
EJE 25(E,B) 5 3/8" 1 53 0.16 0.16 0.095 0.83 43.99
EJE 25(E,B) 5 3/8" 2 54 0.16 0.16 0.095 0.83 89.64
EJE 25(E,B) 5 3/8" 1 15 0.16 0.16 0.095 0.83 12.45
TOTAL 318.72 ML
PROYECTO DE TESIS: GENERADORES GENERADOR CADENAS:ADMINISTRATI
PROYECTO: CENTRO CAFETALERO ES: VO VARILLAS
EDIFICIO: INDUSTRIAL
ZONA:.MAQUINAS FECHA: 20/01/2021 CECAF
UBICACIÓN: POZA RICA, VERACRUZ LONGUITUD X PZA (M) LONGUITUD POR DIAMETRO (M)
CONCEPTO TIPO ° (PULG) NUM.ELEM. #PZAS A B C TOTAL 1/4 3/8 1/2
CADENAS:ADMINISTRATIVO VARILLAS
EJE A(25,29) 1 3/8" 1 4 10.29 10.29 41.16
EJE A(25,29) 1 3/8" 1 4 9.11 9.11 36.44
EJE A(25,29) 1 3/8" 1 4 9.21 9.21 36.84
EJE A(25,29) 1 3/8" 1 4 9.15 9.15 36.6
EJE A(25,29) 1 3/8" 1 4 3.38 3.38 13.52
EJE 25(E,B) 1 3/8" 1 4 10.59 10.59 42.36
EJE 25(E,B) 1 3/8" 2 4 10.79 10.79 86.32
EJE 25(E,B) 1 3/8" 1 4 2.93 2.93 11.72
TOTAL 304.96 ML
EJE A(25,29) 5 3/8" 1 52 0.16 0.16 0.095 0.83 43.16
EJE A(25,29) 5 3/8" 1 46 0.16 0.16 0.095 0.83 38.18
EJE A(25,29) 5 3/8" 1 47 0.16 0.16 0.095 0.83 39.01
EJE A(25,29) 5 3/8" 1 46 0.16 0.16 0.095 0.83 38.18
EJE A(25,29) 5 3/8" 1 17 0.16 0.16 0.095 0.83 14.11
EJE 25(E,B) 5 3/8" 1 53 0.16 0.16 0.095 0.83 43.99
EJE 25(E,B) 5 3/8" 2 54 0.16 0.16 0.095 0.83 89.64