Page 122 - Mines Facilities Plan
P. 122

ADDITIONAL LAB
                                                             FY32    ASF

















                                                                    EXISTING   LAB ASF




                                                                FY17











                              PHYSICAL INFRASTRUCTURE REQUIRED TO


                                                           For the purposes of these projections, a ratio of 1:0.5 was
                                                  exists. In additional to lab space, research teams will also
                                                                                                                      
                                             projected that it will result in a near doubling of research
                                                     need access to office workplace types of space which is
                                                        in addition to the research laboratory ASF needs noted.
                                                               ce relationship.
                                               laboratory space on the campus from what currently
                                          If the research models above are implemented, it is
                                  MEET PROJECTED DEMAND
                                                             utilized to determine the laboratory:offi This means that for every 1,000 ASF of laboratory space  there should be 500 ASF of office space to support the       Colorado School of Mines Facilities Master Plan









                                                                      research teams.                                 116
   117   118   119   120   121   122   123   124   125   126   127