Page 5 - AREA VII - SELF SURVEY
P. 5

RATING SCALE
             NA           0             1             2              3                  4                 5
              -            -          Poor           Fair       Satisfactory     Very Satisfactory    Excellent
             Not        Missing     Criterion is   Criterion is   Criterion is   Criterion is fully met in  Criterion is
          Applicable                   met        met in most      met all     all respects, at a level   fully met
                                   minimally in   respect, but    respects       that demonstrates       with
                                      some           some                         good practices      substantial
                                   respects, but  improvement                                         number of
                                      much       is needed to                                           good
                                   improvement     overcome                                           practices,
                                   is needed to    weakness                                            at a level
                                    overcome                                                             that
                                    weakness                                                          provides a
                                                                   (100%       (50% greater than the   model for
                                    (75% lesser   (50% lesser    compliance         standards)          others
                                     than the      than the       with the
                                    standards)    standards)     standards)                             (75%
                                                                                                       greater
                                                                                                       than the
                                                                                                      standards)





                                     Indicators                                          Item Rating (IR)   Outcome Mean (SIOM   Implementation   System –   Parameter Mean (PM)










         PARAMETER A: ADMINISTRATION

         SYSTEM – INPUTS AND PROCESS

         S.1 the organizational structure of the library is well-defined.                5

         S.2 The development of the library goals and objectives is the                  5
         responsibility of the library and staff with the approval of the
         head of the institution.

         S.3 There is a library board/committee which sets library policies,             5
         rules and procedures and periodically reviews them.

         S.4 There is a duly approved and widely disseminated library                    5
         manual or written policies and procedures covering the library’s                          5
         internal administration and operation.                                                              5
   1   2   3   4   5   6   7   8   9   10