Page 6 - LCCTC School Newsletter
P. 6

L C C T C   D I G E S T




       perkins v comprehensive local needs assessment survey
       perkins v comprehensive local needs assessment survey


     Beginning Friday, January 17 through Monday, January 27, 2020,

     the Santee-Lynches Region Needs Assessment/Gap Analysis

     online survey will be open to parents of the 6th through 12th

     grades, business, and industry.



                                  Lee County Parent(s) Survey







          PROJECT LEAD THE WAY END OF COURSE ASSESSMENT SCALE
          PROJECT LEAD THE WAY END OF COURSE ASSESSMENT SCALE

        The   new   PLTW   assessment   marks   a   turning   point   in   student   recruitment   for   business   across   the
        country.    For  years,  we've  sought  graduates  who  have  mastered  the  types  of  skills  PLTW  students
        gain   through   their   coursework,   but   have   faced   increased   challenges   in   identifying   those   who   are
        ready  to  hit  the  ground  running  in  the  workplace.    By  giving  businesses  a  tool  to  validate  these  skills,
        PLTW  is  making  it  possible  for  employers  like  Toyota  to  recognize  and  hire  the  top  talent  we  need  to
        drive our business forward."  Brain Krinock, Toyota Motor North America Senior Vice President.

        Introduction to Engineering Design 2019-2020

        PLTW   has   established   four   performance   levels   to   indicate   a   student's   performance   on   an   End-of-
        Course  Assessment--Novice,  Practiced,  Accomplished,  and  Distinguished.  Those  students  that  took
        the   Introduction   to   Engineering   Design   EOC   exam   performance   levels   were   Practiced.   Practiced
        stated that students use routine procedures and concrete concepts in the PLTW Pathways.
        Practiced students use creative, critical, and logical reasoning to solve simple problems.
   1   2   3   4   5   6