Page 46 - igem-g-4 edition 2_Neat
P. 46

IGEM/G/4 Edition 2
             tandem control
             Arrangement of two pilot operated regulators or two control valves in series and is a derivative
             of monitor and active control.

             tank, relating to a watersealed gasholder
             Vessel holding water which maintains a seal as the lifts rise from and fall into it.

             tank balcony (platform)
             Walkway around the raised tank of a watersealed gasholder.

             technical appraiser
             Person who is technically competent in an appropriate professional discipline.

             technical handbook
             Technical project file for specific plant.

             telemetry
             Transmission of information and control actions which will allow the operation of equipment
             remotely (as opposed to locally).

             temperature/pressure sensor
             Device that detects a change  of physical parameter  and generates an electrical signal
             corresponding to that change.

             temporary operating pressure (TOP)
             Maximum pressure at which a system can be  operated temporarily under the control of
             regulating devices during fault conditions.

             temporary vent
             Purpose-designed demountable vent stack, which is erected temporarily for the purpose of
             venting piping or pipework or plant for maintenance and commissioning operations.

             terminal
             Device fitted at the flue outlet to allow or assist products of combustion to escape, minimise
             down draught and prevent entry of material which might block the flue.

             test meter
             Meter temporarily installed to measure a defined parameter.

             thermal cut off device (TCO)
             Valve that automatically closes when the measured temperature reaches a  pre-determined
             level.

             thermowell
             Metal pocket protruding into a fluid stream/system to house a temperature measuring device.

             third party gas escapes
             Escapes of gas from a source other than one for which the gas emergency service provider
             (ESP) is responsible.

             thrust boring
             Method of forming a pilot bore by driving a closed pipe or head from a thrust pit into the soil
             which is displaced.

             tie-in
             Weld to join two sections of pipe or pipework already laid or constructed.

             tightness test
             Test of piping or pipework for leakage.





                                                           42
                     ©IGEM, IGEM House, High Street, Kegworth, Derbyshire, DE74 2DA. Website: www.igem.org.uk
   41   42   43   44   45   46   47   48   49