Page 55 - STS Pre-Site Induction 09.04.21
P. 55

MANUAL HANDLING








          SPECIALIST TECHNICAL SERVICES




                                                                                                                                Put down, then adjust





                                                                                                                                ● If precise positioning of the load is necessary,





                                                                                                                                          put it down first, then slide it into the desired




                                                                                                                                          position. Remain as close as possible to the load




                                                                                                                                          at all times.




































































                                                                                                 SAFETY WITHOUT COMPROMISE















                                                                                 ENGLISH                      FRENCH                      POLISH                   GERMAN                      ITALIAN                  ROMANIAN                        INDIAN
   50   51   52   53   54   55   56   57   58   59   60