Page 55 - STS Pre-Site Induction 09.04.21
P. 55
MANUAL HANDLING
SPECIALIST TECHNICAL SERVICES
Put down, then adjust
● If precise positioning of the load is necessary,
put it down first, then slide it into the desired
position. Remain as close as possible to the load
at all times.
SAFETY WITHOUT COMPROMISE
ENGLISH FRENCH POLISH GERMAN ITALIAN ROMANIAN INDIAN