POOR PLANNING AND MONITORING
COA hits DA for delays in FMRs worth P3.2B
THE Commission on Audit revisiting all FMRs implemented since site/realignment/final listing approval production sites, coastal landing points resident-farmers and fisherfolk in order
(COA) has found the Department of 2010, he added. • 21 were experiencing delayed and post-harvest facilities linking to to identify priority locations of farm-to-
Agriculture (DA) liable over the delays the market and arterial roads and market roads.”
in implementing farm-to-market road 99% obligated funds. According to submission of required documents highways,” the commission noted.
(FMR) projects valued at P3.2 billion, the COA, 99 percent or P8.212 billion • 9 were facing right of way issues Inaccurate status reports. The
supposedly because of poor planning was obligated or committed as of • 8 were suspended / not The roads were supposedly built in commission also found several
and monitoring. December 31, 2014. The unobligated residential areas “where residents are inaccuracies on the DA’s status reports
amount of P81.464 million should implemented for unknown reasons neither agrarian reform beneficiaries on FMR projects.
In a 2014 annual audit report, revert to the DA’s General Fund • 6 were with unliquidated previous nor small farmers/fisherfolk,” the
recently released, the commission and “... no longer be utilized for the commission said. It claimed that based on the audit
noted the department received P8.294 implementation of FMR project.” financial transactions team’s site validation, the FMR projects
billion in allocations for 2014 and The status of 35 projects was not The general guidelines for the Farm- in the following areas were ongoing
2013 for the repair and construction Despite 99 percent commitment of to-Market Road Development Program as of end-December 2014 but the DA
of 2,773 FMR projects in “designated the money, the commission revealed given by the DA. (FMRDP) placed the burden of reported the roads were 100 percent
key production areas...” The roads are that only 67 percent or P5.056 “As a result of the delay and non- responsibility upon the DA to evaluate complete.
1,385.716 kilometers (kms) in length. billion equivalent to 2,016 FMRs and validate each FMR project using
were completed as of December 31, implementation of the projects, the the Philippine Agricultural Engineering • Sibalom, Antique – P1 million
The fund was directly downloaded 2014. It said the completed projects objective of the program to provide Standards (PAES) and taking into • Guimbal, Iloilo – P30 million
to the DA’s Regional Field Units (RFUs) measure 924.781 kms compared to the efficient transport facilities to farmer account the number of farmers and • San Joaquin, Iloilo – P15 million
that are supposed to implement the program’s 1,385.716-km target. beneficiaries for their products was fisherfolk and their families that stand • Tubungan, Iloilo – P50 million
Farm-to-Market Road Development not fully attained as of year-end,” the to benefit from the roads. The DA reported the San Isidro to
Program (FMRDP), the commission The remaining 33 percent or 757 report read. Manahub FMR in Gigaquit, Surigao del
noted. FRMs, measuring 460.935 kms, with The “amount, kind and importance Norte as 100 percent complete, but the
the aggregate cost of P3.238 billion Poor planning. In the case of the DA- of agriculture and fisheries products P9-million project was actually paved
However, the Agriculture “were still ongoing or not yet started” Cordillera Autonomous Region (CAR), produced in the area” must also be but with an unfinished shoulder, the
Department on Friday claimed it had as of end-2014, the COA said. all nine FMR projects amounting to P10 studied, the commission said. commission claimed.
nothing to do with the implementation million “were constructed in locations Meanwhile, the P2-Anas FMR
of the FMR projects in the last two “The Agency’s mandate of without agriculture and fisheries “Had the DA-CAR properly project in Barangay Matin-aoin Burgos,
years. empowering the agriculture and identified and validated the proposed Siargao Island, Surigao del Norte
fisheries sector by providing transport FMRs, the above deficiencies could was reported as 45-percent complete
The implementation of FMRs facilities for the farmers and fisherfolk have been prevented and implemented but was found to have “no physical
were under the Department of Public thru the repair/rehabilitation and instead in other barangays in need of accomplishment per validation,”
Works and highways (DPWH), DA construction of farm-to-market the FMRs,” the report read. according to the commission. The FMR
Spokesperson and Undersecretary for roads was not fully achieved due has a project cost of P10 million.
Field Operations Emerson U. Palad told to the delayed completion and “Interview disclosed that DA-CAR If the DA had hired enough third
GMA News Online. implementation of FMR Projects with discontinued the preparation of an party agencies to monitor projects
an aggregate allocation of P3.2 billion,” FMR Network Plan due to various implementation, such inaccuracies and
“Implementation of 2014 and 2015 the report read. political interventions in the funding of delays could have been avoided, the
FMRs are with DPWH, I think,” he projects,” the commission said. COA noted.
said and proceeded to explain the A total of 469 FMRs equivalent The government also allocated a
Agriculture Department’s role in the to 332.051 kms were still under It revealed that based on the audit separate fund of P150 million for the
scheme of things. construction as of December 31, 2014 team’s review of the agreement among monitoring and evaluation of FMR
while the construction of 288 FMRs the DA-CAR, Baguio City District projects in 2014, the commission
“Fund source ang DA, but there are equivalent to 128.884 kms have yet to Engineering Office (BCDEO) and the pointed out.
justifications for the delay, if any,” he start, according to the commission. then congressman, it was the politician Section 7 of Republic Act 10633 or
said. who should identify and prioritize the the General Appropriations Act (GAA)
Of the 288 FMR projects, the COA FMRs to be constructed, rehabilitated of 2014 cited that the P150 million “...
Palad declined to elaborate on what noted: or improved. The report did not name shall be appropriated for the monitoring
the justifications were. Instead, he the congressman. and evaluation of FMR projects which
pointed at the DPWH. “Better to ask • 156 were under procurement or shall be used exclusively for the hiring
DPWH din. fund transfer stage The agreement violated Section 52 of third party agencies, entities or
of Republic Act 8435 or the Agricultural organizations to monitor compliance
“I’ll write memo for them to • 27 were with the respective MOAs and Fishery Modernization Act of with the construction specifications
comment on the findings,” he said. being prepared of submitted 1997, which states that “the DA shall and project schedule, and evaluate the
coordinate with the LGUs and the quality of FMRs implemented.”
The DA is now in the process of • 26 were undegoing change of Of allocationsfor project monitoring,
58 percent or P87.670 million was
WHAT IS THIS? obligated as of end-December 2014.
But only P623,404 or 0.7 percent was
BSP reminds bank clients of right to ‘cooling off’ period actually used to pay for consultants,
the commission noted.
CLIENTS of financial institutions clients by giving them the opportunity administrative fees plus any mark to The commission claimed the delays
supervised by the Bangko Sentral ng to reconsider long-term investment market costs from the signing of the in hiring consultants “... jeopardized the
Pilipinas (BSP) may cancel contracts decisions,” it added. contract up to its cancellation,” the assurance of project implementation in
without penalty under their right to BSP said. accordance with the approved Program
“cooling-off,” the central bank said on However, this right is only applicable to of Works and other specifications and
Friday. individuals. It does not cover corporations, The respective BSFIs will also have to schedules.”
partnerships, and associations. disclose these costs under the mandate The Agriculture Department should
Under the right to “cooling-off,” of the BSP. n Jon Viktor Cabuenas / NB, GMA institute corrective measures and
clients of BSP-supervised financial “This shall cover investment in impose sanctions against the regional
institutions (BSFIs) are given the right long-term financial instruments with a News / Published / January 15, 2016 / 4:04 pm officials responsible for the FMR
to cancel a contract without penalty remaining term of at least one year,” the that remain incomplete beyond the
within two days from signing the BSP said. timeframe under the agreement, the
contract. commission added. n Elizabeth Marcelo with
These investments include government
“BSFIs should give their clients at securities, corporate bonds, and long Jon Viktor Cabuenas / VS, GMA News / Published /
leat two banking days from the signing term negotiable certificate of deposit
of the contract to cancel,” the central (LTNCD). January 15, 2016 / 5:25 pm
bank said in a statement.
Clients who wish to terminate the
“This right to cooling-off is one agreement must notify the BSFI his
of the key requirements of the new intention which must be put into writing,
BSP Financial Consumer Protection within the cooling-off period.
Regulation that seeks to empower
“The client shall shoulder only
reasonable amount of processing or