        The construction crew started hauling the new greens mix

     sand from the parking lot to the outer loop of the golf course


              last week. Six of nine greens have been filled in and

            compacted within a week. Exactly 12” of greens mix is


        pushed on top of the 4” gravel layer to complete the USGA

           green construction. Grading stakes and soil probes are

       utilized to ensure 12” is installed so that the integrity of the

       subgrade and contours remain unaltered. Greens drainage

        outfalls were also installed on holes #3 and #15, as well as


      gravel on #15. The shaper completed #5 then moved to #11,

             and will move to #10 next. The grounds team fairway


       preparation has also moved to the inner loop, as well as the

                   installation process of new irrigation satellites.