The new driving range tee construction has progressed quickly
over the last week. The subgrade of the tee was graded and
then sand-capped with old greensmix. When finished the tee
will have gained approximately 50% of usable space. New
greensmix was installed in greens #1, #2, and #17. The shaper
constructed #8 green and surround, and it is awaiting approval
for drainage and gravel. New irrigation installation was
completed for #12 and #13 greens and surrounds. Each green
will now have dedicated sprinklers for the green and ones
dedicated for the surround. Whereas before when we watered
greens, the surrounds received the equal amount of water as
he new system will allow us to fine tune water
the greens. T
applications to both surfaces.