        The shaper completed construction of #16 green and


         surround last week and is currently working on #18.


            The lake bulkhead in front of #16 green has been


      smoothed and an erosion fabric will be installed on the


            lake bank, followed by sod. Drainage, gravel, and


              greensmix were installed in #8 green. Irrigation


       installation was completed around #6 green. They are

           currently completing irrigation on #7 and will then


        move to #3. Following irrigation installation, a team is


       hand-detailing the greensmix to ensure the 12” depth


                                                of the profile.