Page 28 - ClubLife Weekly 112522
P. 28

Golf Course Update




















                                                              G R O U N D S
                                                              S U P E R I N T E N D E N T
                                                              S E T H   S M I T H


         The grounds team was

         able to install a truck of
         sod last week to finish:


              The area at the
              beginning of #15

              fairway.
              The back of #7 tee

              complex.

              The low area to the                   Old #7 tee complex
              right of #3 green.

              The major haul road
              from construction in

              front of #10 fairway.

         I expect the sod to still

         grow some roots with any
         warmer days we receive

         in the future. Sod can be

         installed in cooler months
         and will survive just fine

         as long as it receives
         adequate moisture.


                                                   Birdseye of #10 haul road
   23   24   25   26   27   28   29   30   31   32   33