        During the last week, the shaper constructed number #12 green,

           and then #3 green. He is currently working on #15 green and

          surrounds. The construction team has continued to perfect the

          subgrades of new greens on holes #3, #12, and #14. Once the


     subgrade has Chet Williams’ approval, internal drainage will then be

       installed, followed by gravel, and the new sand greens mix. Outlet

     drainage installation for greens and bunkers continued on #12, #13,

        and #14. The new tee box for #4 has been rough shaped and will


             add much needed space to the teeing surface. On Monday,
      drainage and gravel installation began on #6 green. Drain lines are

               trenched on 15 feet spacing, followed by perforated pipe

      installation with a 4” gravel blanket on top, to then be followed with

        12” of greens mix. It is a fascinating process that I hope you enjoy

                            following along with through the project.