During the last week, the shaper constructed number #12 green,
and then #3 green. He is currently working on #15 green and
surrounds. The construction team has continued to perfect the
subgrades of new greens on holes #3, #12, and #14. Once the
subgrade has Chet Williams’ approval, internal drainage will then be
installed, followed by gravel, and the new sand greens mix. Outlet
drainage installation for greens and bunkers continued on #12, #13,
and #14. The new tee box for #4 has been rough shaped and will
add much needed space to the teeing surface. On Monday,
drainage and gravel installation began on #6 green. Drain lines are
trenched on 15 feet spacing, followed by perforated pipe
installation with a 4” gravel blanket on top, to then be followed with
12” of greens mix. It is a fascinating process that I hope you enjoy
following along with through the project.