The shaper completed construction of #16 green and
surround last week and is currently working on #18.
The lake bulkhead in front of #16 green has been
smoothed and an erosion fabric will be installed on the
lake bank, followed by sod. Drainage, gravel, and
greensmix were installed in #8 green. Irrigation
installation was completed around #6 green. They are
currently completing irrigation on #7 and will then
move to #3. Following irrigation installation, a team is
hand-detailing the greensmix to ensure the 12” depth
of the profile.