               Michael Welz, CSI, CDT | Quality Assurance Director



               Mike began his association with Bernardon in 1986.  As Quality Assurance Director,
               his chief responsibilities include helping to maintain quality assurance procedures for
               the firm in order to build high quality into the construction design process and minimize
               the reliance on last-minute error detection. He also maintains a high level of experience
               and  proficiency  in  building  construction  detailing,  familiarity  with  AIA  and  CSI
               documents, and fluency with building code applications and industry-wide trends and
               innovations.  His experience as an on-site representative, working closely with Owners
               and  Construction  Managers  and  maintaining  document  and  specification  compliancy
               during construction, has given him a unique understanding of the key considerations to
               look for during the QA process.


               Bernardon’s Quality Assurance Program has several parts and the final review is an
               item-by-item,  multi-step  procedure  of  reviewing  and  checking  the  documents.    This
               process  is  performed  on  each  element  of  the  documents  and  coordinated  with  all   Education
               disciplines.    Quality  is  managed  through  milestones  identified  in  the  design  process,
               allowing a thorough document review prior to issuing.  Quality Control/Quality Assurance   Bachelor of Architecture,
               milestones include:                                                        Drexel University

                                                                                          Registrations & Certifications
                 Schematic Design Review
                 The Quality Assurance Director’s initial involvement begins by working with the   Certified Construction Documents
                 design  team  at  the  schematic  design  phase.    At  this  point,  the  initial  design  is   Technologist (CDT), Construction
                 evaluated  and  reviewed.    Any  research  required  by  unique  project  requirements   Specifications Institute (CSI)
                 are identified and performed by the project team under the review of the Quality   Certified Accessibility Inspector/
                 Assurance Director.                                                      Plans Examiner, International
                 Design Development Review                                                Code Council (ICC)
                 The project design and production team, in conjunction with the Quality Assurance
                 Director and the firm Principals, expand the scope of technical review to that of   U.S. Army Corps of Engineers,
                 specific materials and building systems planned for the project.  Project-specific   Construction Quality Management
                 consultant coordination interface areas are identified and a process is developed to   for Contractors
                 address these issues during the course of construction document production.
                 Construction Document Review
                 During  the  Construction  Documents  phase,  a  full  discipline  project  review  is
                 undertaken.    The  interdisciplinary  team  approach  verifies  that  the  construction
                 plans  and  all  aspects  of  technical  development  and  specifications  are  on-track.
                 All interior and exterior materials and engineering systems are finalized by each
                 discipline.
               “When performed properly, the Quality Assurance process will benefit all parties

               involved and help to ensure a successful project.”





            BERNARDON | Response to Request for Proposal for Architectural and Engineering Services
            JLL - PDS | Project Pegisis | July 20, 2021                                              Appendix-Page 5