            Saint-Gobain and CertainTeed North American Headquarters


            Location: Malvern, Pennsylvania

            Design Statement:  Bernardon  provided  architectural
            design services for the new North American headquarters of
            Saint-Gobain, the largest building materials manufacturer in
            the world, and its subsidiary CertainTeed. The design team
            had to revive an aging structure on an abandoned, 65-acre
            corporate campus.

            The original buildings were built in the 1960s with a modern
            glass  and  exposed  steel  structure  that  over  the  years
            developed unappealing rust stains on the façade. The two
            buildings were also built on different elevations with just a
            small connecting corridor. Plus, because the structures were
            mainly  glass  and  steel,  there  was  virtually  no  insulation   partially  inspired  by  the  Saint-Gobain  Pavilion  at  the  1937
            and  no  thermal  break  from  the  exterior  to  interior  steel   Paris World’s Fair, harking back to their identity as a historic
            frames. Though inefficient and visually unappealing, the old   French company.
            buildings and HVAC systems remained fairly well maintained
            despite the years of vacancy, and the campus was plentiful   Curving  around  a  spacious  outdoor  area  conceived  to
            in  natural  features.  The  renovated  headquarters  is  a  bold,   enhance casual interaction, the campus has a simultaneously
            beautiful, 280,000 SF office building with an innovative and   transparent  and  embracing  ambiance.  In order to create
            eye-catching design.  To create Saint-Gobain’s desired “iconic   the new building envelope, the old buildings had to
            design,”  the  design  team  developed  a  curved  glass  façade   be  stripped  down  completely  to  their  core  skeletal
                                                                 structure. The occupants of the new headquarters would not

            BERNARDON | Response to Request for Proposal for Architectural and Engineering Services
            JLL - PDS | Project Pegisis | July 20, 2021                                              Appendix-Page 11
   19   20   21   22   23   24   25   26   27   28   29