Page 15 - Bernardon Response to RFP-CRISP Bldg 709
P. 15

www.bernardon.com












               Michael Welz, CSI, CDT | Quality Assurance Director



               Mike began his association with Bernardon in 1986.  As Quality Assurance Director,
               his chief responsibilities include helping to maintain quality assurance procedures for
               the firm in order to build high quality into the construction design process and minimize
               the reliance on last-minute error detection. He also maintains a high level of experience
               and proficiency in building construction detailing, familiarity with AIA and CSI
               documents, and fluency with building code applications and industry-wide trends and
               innovations.  His experience as an on-site representative, working closely with Owners
               and Construction Managers and maintaining document and specification compliancy
               during construction, has given him a unique understanding of the key considerations to
               look for during the QA process.


               Bernardon’s Quality Assurance Program has several parts and the final review is an
               item-by-item, multi-step  procedure  of reviewing  and checking  the  documents.   This
               process  is  performed  on  each  element  of  the  documents  and  coordinated  with  all   Education
               disciplines.  Quality is managed through milestones identified in the design process,
               allowing a thorough document review prior to issuing.  Quality Control/Quality Assurance   Bachelor of Architecture,
               milestones include:                                                        Drexel University

                                                                                          Registrations & Certifications
                 Schematic Design Review
                 The Quality Assurance Director’s initial involvement begins by working with the   Certified Construction Documents
                 design team at the schematic design phase.  At this point, the initial design is   Technologist (CDT), Construction
                 evaluated and reviewed.  Any research required by unique project requirements   Specifications Institute (CSI)
                 are identified and performed by the project team under the review of the Quality   Certified Accessibility Inspector/
                 Assurance Director.                                                      Plans Examiner, International
                 Design Development Review                                                Code Council (ICC)
                 The project design and production team, in conjunction with the Quality Assurance
                 Director and the firm Principals, expand the scope of technical review to that of   U.S. Army Corps of Engineers,
                 specific materials and building systems planned for the project.  Project-specific   Construction Quality Management
                 consultant coordination interface areas are identified and a process is developed to   for Contractors
                 address these issues during the course of construction document production.
                 Construction Document Review
                 During the Construction Documents phase, a full discipline project review is
                 undertaken.  The interdisciplinary team approach verifies that the construction
                 plans and all aspects of technical development and specifications are on-track.
                 All interior and exterior materials and engineering systems are finalized by each
                 discipline.
               “When performed properly, the Quality Assurance process will benefit all parties

               involved and help to ensure a successful project.”





            BERNARDON | Response to Request for Proposals | MRA Development Services, Inc.
            Chestnut Run Innovation & Science Park | Single Tenant Laboratory & Office Building | July 19, 2021  Page 9
   10   11   12   13   14   15   16   17   18   19   20