Page 8 - Bernardon-Equus Suffolk, VA RFP Response
P. 8
www.bernardon.com
Exhibit A - Design RFP Cost Breakdown
Services (SuffolK)
Schematic Design
Architectural $12,000
Structural $2,500
M/E/P/FP $3,000
Subtotal $17,500
Design Development
Architectural $18,000
Structural $4,500
M/E/P/FP $8,000
Subtotal $30,500
Construction Documents
Architectural $38,000
Structural $10,000
M/E/P/FP $10,000
Subtotal $58,000
Bidding & Award
Architectural $2,000
Structural $400
M/E/P/FP $1,000
Subtotal $3,400
Construction Administration
Architectural $69,600 Note 1
Structural $3,500
M/E/P/FP $4,200
Subtotal $77,300
Project Close-Out
Architectural Not included Note 2
Structural Not included Note 2
M/E/P/FP Not included Note 2
Subtotal Not included Note 2
Reimbursables Allowance $22,000 Note 3
Total $208,700
Unit Pricing
3-D Photorealistic Renderings - Aerial $3,000 each
3-D Photorealistic Renderings - Ground Level $3,000 each
Notes
1.) Nineteen (19) on-site construction progress meetings included. We have included $2,400 per meeting
excluding expenses. Therefore, the total architectural fee value of Construction Administration includes
$45,600 associated with attending meetings at the project site. The remaining $24,000 is associated with the
other Construction Administration services outlined in the proposal.
2.) The specific scope of Project Close-Out was not defined in the RFP.
3.) We have included $650 per on-site construction progress meeting for travel expenses.
BERNARDON | Response to Request for Proposal for Design Services Page 5
Equus Development, L.P. | Lot 23 at VA Port Logistics Park, Suffolk, VA | July 30, 2021