EtaGen



            Location: Multiple Locations

            Design Statement:  The linear generator demonstration
            project delivers on site 24/7, fuel-flexible power at a lower
            cost than the electric grid. This turn-key design-build project
            enables a board range of applications on both the customer
            and utility sides of the meter. The ability to seamlessly
            switch between gaseous fuels, including renewable biogas
            and hydrogen, provides increased resiliency and additional
            carbon savings. High efficiency and full dispatchability
            load-tracking, fast off/on, black start, and islanding offers
            the most cost-effective solution for both firming renewable
            generation and ensuring 24/7 clean power.