Page 10 - Bernardon-Limestone Medical Center RFP Response
P. 10
www.bernardon.com
Michael W. Bach, AIA, ACHE, Senior Project Architect, Michael Welz, CSI, CDT, will provide his high level
brings more than 20 years of experience devoted of experience and proficiency in building construction
exclusively to providing superior design solutions to detailing, familiarity with AIA and CSI documents, and
healthcare clients from large academic medical centers to fluency with national building code applications and
small regional hospitals and ambulatory surgery centers. industry-wide trends and innovations. His experience as
Michael will lead the medical planning effort and will be an on-site representative, working closely with Owners
the primary interface with the user groups. and Construction Managers, and maintaining document
and specification compliancy during construction,
Keri Morton-Wiedner, AIA, will serve as Project has given him a unique understanding of the key
Director. She will work closely with Bill and Michael considerations to look for during the QA process. He is
relative to the internal task of organizing, executing, and a Certified Construction Documents Technologist (CDT),
coordinating project assignments, as well as managing an active member of the Construction Specifications
the preparation of the Master Planning Report. Institute (CSI), and a Certified Accessibility Inspector/
Plans Examiner by the International Code Council (ICC).
Robin E. Tait, IIDA, will lead the interior design team
as Director of Interior Design, lending her significant The Bernardon team will be further supported by
healthcare design expertise to the process of defining members of our 78-person design firm. This level of
Bernardon's patient-centered approach to the three talent and depth allows us to provide the necessary
dimensional aspects of each proposed ASC concept design team support to complete this project in a timely manner.
option. Robin places an emphasis on the importance of Based on our current workload and client commitments,
client satisfaction and bringing “something extra” to every the Bernardon team is available to begin services
project. This attitude has resulted in long-lasting client immediately.
relationships with a corresponding number of successfully
completed projects. Robin’s extensive healthcare Resumes for key members of the Bernardon team can
experience includes providing space planning services for be found in the pages that follow.
multi-tenant medical office buildings, procedure suites,
surgery centers, and private practice suites.
Rebecca Blake Cardamone, IIDA will serve as Senior
Interior Designer, assisting Robin with the implementation
of the approved concept when the project moves to the
documentation phase. Rebecca has managed the design,
documentation, and construction administration of many
primary care and procedure suites. Her design talents and
project management abilities, as well as her healthcare
design expertise makes Rebecca an invaluable member of
our healthcare design team.
BERNARDON | Response to Request for Proposal Architectural and Engineering Master Planning Services
Aegis Property Group | Limestone Medical Center, LLC | July 1, 2021 Page 4