Page 15 - Statement of Qualifications - 7/20
P. 15

RLC EXPERIENCE




         anton, ME – 51 MW wind project – conceptual design
          C
          of 34.5 kV collection system and interconnection

          V
         inalhaven Island, ME – 4.5 MW wind project – detailed
          design of 12.47 kV collector system and 34.5/12.47 kV
          Substation upgrade

         Highland Plantation, ME – 156 MW wind project-
          preliminary design of 34.5 kV collector system,
          115/34.5kV collector substation, and 115
          kV transmission line
          R
         oxbury, ME  – 55 MW wind project – conceptual
          design of common utility/collector system substation
          and alternative interconnection assessment
          S
         addleback Mountain, ME – 34.5 MW wind project
          – preliminary & detailed design of 34.5 kV collection
          system and interconnection
         ibby Wind Project – conducted short circuit,
          K
          coordination and arc flash hazard analysis
          K
         ibby Wind Project – designed and guided
          implementation of an integrated voltage control system

         Woodstock, ME – 20 MW wind project – detailed
          design, construction management, and commissioning
          of 34.5 kV aerial and underground collection system
          and interconnection
          T
         ownship 16, ME – 34.2 MW wind project – preliminary
          design of 34.5 kV collector system interconnection

         Oakfield, ME – 141 MW wind project – revised
          preliminary collector and interconnection design to
          accommodate change to larger wind turbine


        New England (Other)
         Nantucket Sound – 462 MW wind project – evaluated
          transmission issues
          C
         oos County, NH – 99 MW wind project – preliminary
          design of 34.5 kV collector system, 115/34.5kV
          collector substation, 115 kV 3 breaker ring bus
          interconnection substation and 115 kV transmission
          line
         dams, MA – 24 MW wind project – conceptual design
          A
          of 34.5 kV collection system and interconnection
         Brodie Mountain, MA – 15 MW wind project – 23 kV
          distribution system impact analysis



 14       STATEMENT OF QUALIFICATIONS                               STATEMENT OF QUALIFICATIONS                         15
   10   11   12   13   14   15   16   17   18   19   20