RLC EXPERIENCE
anton, ME – 51 MW wind project – conceptual design
C
of 34.5 kV collection system and interconnection
V
inalhaven Island, ME – 4.5 MW wind project – detailed
design of 12.47 kV collector system and 34.5/12.47 kV
Substation upgrade
Highland Plantation, ME – 156 MW wind project-
preliminary design of 34.5 kV collector system,
115/34.5kV collector substation, and 115
kV transmission line
R
oxbury, ME – 55 MW wind project – conceptual
design of common utility/collector system substation
and alternative interconnection assessment
S
addleback Mountain, ME – 34.5 MW wind project
– preliminary & detailed design of 34.5 kV collection
system and interconnection
ibby Wind Project – conducted short circuit,
K
coordination and arc flash hazard analysis
K
ibby Wind Project – designed and guided
implementation of an integrated voltage control system
Woodstock, ME – 20 MW wind project – detailed
design, construction management, and commissioning
of 34.5 kV aerial and underground collection system
and interconnection
T
ownship 16, ME – 34.2 MW wind project – preliminary
design of 34.5 kV collector system interconnection
Oakfield, ME – 141 MW wind project – revised
preliminary collector and interconnection design to
accommodate change to larger wind turbine
New England (Other)
Nantucket Sound – 462 MW wind project – evaluated
transmission issues
C
oos County, NH – 99 MW wind project – preliminary
design of 34.5 kV collector system, 115/34.5kV
collector substation, 115 kV 3 breaker ring bus
interconnection substation and 115 kV transmission
line
dams, MA – 24 MW wind project – conceptual design
A
of 34.5 kV collection system and interconnection
Brodie Mountain, MA – 15 MW wind project – 23 kV
distribution system impact analysis