Page 16 - Statement of Qualifications - Haley Edit 3
P. 16

RLC EXPERIENCE





                                                           Greenfield, MA – 1.5 MW Axio Green photovoltaic
                                                            project 13.8 kV distribution system impact
                                                            analysis

                                                            P
                                                           ittsfield, MA – 1.5 MW Silver Lake photovoltaic
                                                            project – 23 kV distribution system impact analysis
                                                            P
                                                           ittsfield, MA – 2.0 MW Pittsfield Sanitary District
                                                            photovoltaic project – 23 kV distribution system
                                                            impact analysis

                                                            G
                                                           eorgia Mountain, VT – 10 MW wind project –
                                                            conceptual and detailed design of 34.5 kV collection
                                                            system and interconnection

                                                           owell, VT – 42 MW wind project – conceptual design
                                                            L
                                                            of 34.5 kV collection system and interconnection
                                                            L
                                                           owell, VT – 63 MW wind project – preliminary and
                                                            detailed design of 34.5 kV aerial and underground
                                                            collection system, collector substation and upgrades
                                                            to other local 46 kV substations

                                                            R
                                                           utland, VT – 85.5 MW wind project – conceptual
                                                            design of 34.5 kV collection system and
                                                            interconnection

                                                           earsburg, VT – 45 MW wind project – preliminary
                                                            S
                                                            design of 34.5 kV collector system and 69/34.5 kV
                                                            collector substation

                                                            S
                                                           heffield, VT – 40 MW wind project – transmission/
                                                            interconnection testimony on system impact
                                                           Bristol, NH – 80 MW wind project – Conceptual
                                                            design of 230 kV interconnection substation and
                                                            34.5 kV collector system

                                                            F
                                                           erdinand, VT – 91 MW wind project – Conceptual
                                                            design of 115 kV interconnection substation and
                                                            34.5 kV collection system


                                                          Canada
                                                           Norway, PEI – 9 MW wind project – detailed design
                                                            and construction management of 34.5 kV collector
                                                            system and 69/34.5 kV collector substation
                                                           West Cape, PEI – 99 MW wind project – detailed
                                                            design and construction management of 34.5 kV
                                                            collector system and 138/34.5 kV collector substation
                                                           Mont Copper, Quebec – assessment of 34.5 kV
                                                          collector system 



       16            STATEMENT OF QUALIFICATIONS                                                                                                                                               STATEMENT OF QUALIFICATIONS                         17
   11   12   13   14   15   16   17   18   19   20   21