RLC SERVICES
Millyard Substation
The Millyard Substation project included retiring the existing 34.5
– 4.16 kV substation and building a new substation on the adjacent
property. The new substation included two new 34.5-4.16 kV, 10
MVA transformers, two new 34.5 kV circuit breakers, and one new
4.16 kV metalclad switchgear, including relaying and battery systems.
RLC created the Detailed Engineering documents required to
construct the project.
MEPCO 392,396 & 3001 Structure Replacement
The MEPCO Project was for the design of replacement structures
for three, 345 kV transmission lines. The lines stretch 127 miles
and include over 1000 structures. In addition to the structure
replacement design, RLC also developed a design criteria document
to specify present and future transmission system modification
design requirements. Deliverables included construction documents,
construction specifications, material list and plan and profiles.
South Meadow Breaker Replacement
RLC provided design services for the replacement of thirty-eight,
23 kV oil circuit breakers. The work also included the replacement
of twenty-one each disconnect switches as part of the Bus
Rehabilitation and nine Relay Replacements. RLC developed all
design documents required for construction. Construction support
services were provided along with as-built documents. Rehabilitation
and nine Relay Replacements. RLC developed all design documents
required for construction.
Capital Investment (Estimating Services)
RLC provides a complete portfolio of estimating services ranging
from level 1 to 4 for all major design discipline activities. Services
range from basic scoping to complete system upgrade detailed
Estimates of Probable Cost. Our clientele include Renewable Energy
Developers, Utilities and Independent System Operators. RLC is well
versed in all major Northeast utility estimating procedures along with
ISO-NE’s Procedure 4, and +- 50%/25% Estimate of Probable Cost
process.
Facilities Studies
RLC continuously performs studies to identify equipment and related
costs necessary to design, engineer, procure, construct, install,
test and commission the subject Project and Project’s Network
Upgrades Facilities (NUF) necessary to reliably interconnect to the
Transmission Owner’s system. RLC works with the subject Project’s
Developer and Connecting and Affected Transmission Owner(s) to
ensure the Project is performed in accordance with the Scope of
Work.