Page 58 - The TM Submarine Cable Book
P. 58
5: Connections around the world
OWNERSHIP
TELEKOM MALAYSIA, DTAC, EZECOM
AND SYMPHONY.
CABLE LENGTH
• Approximately 1300 km and further
access to Indochina countries like Laos,
Myanmar and Vietnam via terrestrial links.
SYSTEM CAPACITY
• The cable consists of 6 fibre pairs and
design capacity of more than 30Tbps.
TECHNOLOGY
• 100 Gigabits per second (Gbps)
upgradable technology, High end Dense
Wavelength Division Multiplexing (DWDM).
SYSTEM COMMISSIONING AND
UPGRADE
• Ready for service in March 2017.
• Estimate end of service in 2042.
MCT LANDING STATIONS
1. Cherating, Malaysia.
2. Rayong, Thailand.
3. Sihanoukville, Cambodia.
57