Page 285 - UAE Truncal States
P. 285

Chapter Seven

                 whereby most community services were undertaken by private
                companies; this feature helped in later years to make the economic
                structure of Dubai appear very different from that of the other
                members of the federation. Many of the services which had become
                 desirable or necessary for the City Stale were not provided or
                organised by government or municipality but by private companies.
                The Dubai Electricity Co. was owned from its inception by a number
                of local merchants and the Ruler, who was chairman of the board;39
                 the majority shareholder in the Dubai Slate Telephone Company was
                International Aeradio Ltd., the Ruler held the rest of the shares and
                 was also the chairman of this board. Similar arrangements, whereby
                 the Ruler set up private companies in which he held a sizeable share
                 were made later as the need for other services developed.40
                   Between 1959 and 1961 an airstrip was built with sabkhah which
                 was brought from the salt flats along the coast;41 it could take
                Dakotas and Herons, and in 1962 Viscounts of Kuwait Airways
                 started a service three times per week. In December 1963 work
                 started on an airport extension, and since the area is low-lying and
                 liable to flooding it was desirable to provide protection and to
                stabilise the shore line of the inner creek. When approached to
                consider establishing a weekly VC 10 flight to Dubai, the British
                Overseas Airways Corporation was reluctant to commit itself
                because the company thought that there would not be enough
                demand. An inquiry among the foreign arms operating in Dubai and
                among the Trucial Oman Scouts showed that there was great interest
                in such a flight, and the Ruler guaranteed BOAC that a certain
                number of seats would be occupied from Dubai on each flight. In fact
                the demand for seats on these flights grew much faster than he had
                anticipated, and even before the runway was completed in June 1965,
                other airlines approached the Ruler of Dubai for landing rights.
                  The other big communications project was the construction of a
                bridge across the creek to save cars travelling between Dubai and
                Dairah the long detour around the head of the creek. A study was
                prepared by a consultant to find the cheapest way to build this bridge   /
                at a convenient crossing point. But Dubai’s financial commitments
                were  already approaching the limit of what was then considered to
                be a prudent assessment of the State’s ability to pay back the various
                loans in the foreseeable future. Shaikh Rashid bin Sa'fd therefore
                a  pproached his son-in-law, the Ruler of Qatar, to pay for a bridge
                more  expensively designed than had originally been intended. After

                260
                                                                                   I
   280   281   282   283   284   285   286   287   288   289   290