CHAPTER II.
NOTE ON EVENTS IN THE BIICARZ AREA DURING 1938.
Work 1ms continued on development of our Southern Area during the
year undor reviow. A track is being prepared for the 12" oil pipe-line to be
constructed between Gacli Saran and our Abadan Refinery.
In Gash Saran two oil wells and one gas well were completed, and three
wells aro now in the process of drilling. Preparations are also in hand to drill
a further two locations when work on those drilling at present is completed.
Improvements woro made to the Ganowch-Gach Saran Road, major
work being carried out between mile 20 and mile 43. The Kumbal-
Pokak Road was widened to a 16 ft. carriage way and tho alignment was
improved and alterations made to bad corners. One bridge of 3-20 ft.
spans was constructed over tho Kumbal River. The road from Bah Moha-
med (Gach Saran) to our new development area at Du Gumbadan was widened
to a 20 ft. carriage way as far as the Amniyeh Post, all bad corners being
improved and minor diversions made to improve alignment.
Tho Dasht-i-Mirza Road was widened to a 16 ft. carriage way from Ab-i-
Shirin to Dasht-i-Mirza. The Khairabad Bridge, mentioned in our last report
No. D/O 79/7 of 23rd April 1938, is now completed, except for painting ;
therefore the road from Bchbchan to Gach Saran is now an all weather one.
Additional quarters for Staff and Labour have been constructed and others
commenced. The existing Cold Store at Gach Saran was removed, and a new
cold store consisting of an insulated concrete room was placed in operation
in the new Ice Factory. The Gach Saran Staff Club was altered for the
installation of Cinema machines.
The following British and British Indian subjects were employed in the
area :—
Wives
Staff. nad
children.
Gach Saran and Ganoweh British . 49 15
British Indian 34 4
Agha Jari and Pazanun British . 28 6
British Indian 26 8
Pipe Line Construction British . 9 1
British Indian 6
Totals 152 34
As the tonnage to be handled at Ganoweh during the next few years will
bo greatly increased owing to the development taking place in Gach Saran,
the Ganoweh layout is being reorganised. This is taking the form of new
transhipment buildings, jetty, roads and cargo handling facilities. Housing
is under construction for Artisan and Unskilled staff.
A new water line has been laid at Ganoweh, and a pumping plant has
been installed at several wells on a location approximately five miles north of
the station. New water storage tankes are being erected which will give ade
quate supply to the entire Company’s area. New Power Generating sets
have been installed, and a new dispensary is now under construction to provide
additional medical service to the area.