                Work 1ms continued on development of our Southern Area during the
            year undor reviow. A track is being prepared for the 12" oil pipe-line to be
            constructed between Gacli Saran and our Abadan Refinery.
                In Gash Saran two oil wells and one gas well were completed, and three
            wells aro now in the process of drilling. Preparations are also in hand to drill
            a further two locations when work on those drilling at present is completed.
                Improvements woro made to the Ganowch-Gach Saran Road, major
            work being carried out between mile 20 and mile 43. The Kumbal-
            Pokak Road was widened to a 16 ft. carriage way and tho alignment was
            improved and alterations made to bad corners. One bridge of 3-20 ft.
            spans was constructed over tho Kumbal River. The road from Bah Moha-
            med (Gach Saran) to our new development area at Du Gumbadan was widened
            to a 20 ft. carriage way as far as the Amniyeh Post, all bad corners being
            improved and minor diversions made to improve alignment.
                Tho Dasht-i-Mirza Road was widened to a 16 ft. carriage way from Ab-i-
            Shirin to Dasht-i-Mirza. The Khairabad Bridge, mentioned in our last report
           No. D/O 79/7 of 23rd April 1938, is now completed, except for painting ;
            therefore the road from Bchbchan to Gach Saran is now an all weather one.
               Additional quarters for Staff and Labour have been constructed and others
            commenced. The existing Cold Store at Gach Saran was removed, and a new
            cold store consisting of an insulated concrete room was placed in operation
            in the new Ice Factory. The Gach Saran Staff Club was altered for the
           installation of Cinema machines.
               The following British and British Indian subjects were employed in the
           area :—
                                                                        Wives
                                                                Staff.   nad
                                                                       children.
           Gach Saran and Ganoweh  British .                     49       15
                                   British Indian                34       4
           Agha Jari and Pazanun   British .                     28       6
                                   British Indian                26       8
           Pipe Line Construction  British .                      9       1
                                   British Indian                 6
                                                 Totals         152      34

               As the tonnage to be handled at Ganoweh during the next few years will
           bo greatly increased owing to the development taking place in Gach Saran,
           the Ganoweh layout is being reorganised. This is taking the form of new
           transhipment buildings, jetty, roads and cargo handling facilities. Housing
           is under construction for Artisan and Unskilled staff.
               A new water line has been laid at Ganoweh, and a pumping plant has
           been installed at several wells on a location approximately five miles north of
           the station. New water storage tankes are being erected which will give ade­
           quate supply to the entire Company’s area. New Power Generating sets
           have been installed, and a new dispensary is now under construction to provide
           additional medical service to the area.