Page 22 - 288 Birch Road brochure 2024
P. 22

HOME IMPROVEMENTS   AND FEATURES







         •  Driveway sealed (May 2024)                        routinely maintained by Connecticut Air
         •  New Roof Maxx treatment (April 2024)              Systems of Milford
            (which revives shingles for another 5 years.  •  New hot water heater (2011), installed by
            Chimney was also re-sealed. Top roof only)        Connecticut Air Systems
         •  Upstairs bathroom: new vanity sink &  •  New breaker box inside and out in (2011)
            fixtures, new subway tile in shower, new       •  New electrical downstairs in (2011)
            faucets, and new floor tile (2022)
         •  New HVAC system (2011), installed and          •
   17   18   19   20   21   22   23   24   25   26   27