Page 19 - One Piece Ebook 22
P. 19
INSTALLATION
As your pool is constructed off-site, installation takes a fraction of the
time and is far less contingent upon weather conditions and
expensive specialist labour compared to pools that use traditional
build methods.
Once manufactured, the pool will be transported to site and can
either be offloaded directly from the transport vehicle into the
excavation, or lifted in via a crane depending on the access to your
property.
Once the pool is in place, pool to plant room pipework is installed, the
filtration and heating systems are connected and the pool is filled and
secured with a concrete ring beam around it’s perimeter to anchor it
in place.
Finally the cover slats are fitted and the pool is ready for
commissioning.
17 5 18