PROPUESTA TÉCNICA
PERFORACIÓN POZO PRODUCTOR BRS-4
Work/Roles
Project / Timeline Details
Owner Wash / Mining / Conversions Completions / Workovers
FEED/AFE Design Regulatory Procurement Drilling MIT Construction Disposal Wells AUDIT
Completed FEED study
for AFE Costs purposes
Williams 2015 – X X for feasibility of 3 entry
rd
Energy 2016 X option into existing
Cavern.
Designed cavern
proposal to drill and
Pembina 2015 – complete existing brine
rd
nd
(Corunna, X X X caverns (2 & 3 entries).
ON) 2016 Designing hydraulics for
possible summer 2016.
5 x Caverns
Plains (6 wells).
Midstream Performed first 3
Canada- Ft. 2013- completions, then
Saskatchewan 2015 X X X advised PMC on future
workovers.
Successful Halite core
retrieval
1 x Cavern.
Plains 2 x Disposal wells.
Midstream 2015 X X X X X X Successfully retrieved
Canada- X complete Salt core
Kerrobert (Halite & Carnalite
sections) for analysis.
Drilled a strat core
well in 2014 to
evaluate asset.
Veresen
Infrastructure 2014 – X X X X X X X X
Inc. 2016 FEED study/AFE in
2016:
2 x Disposal wells, 2 x
Caverns near
Burstall, Sask.