Page 246 - Popuesta técnica pozo productor BRS-4_20211119_VF
P. 246

PROPUESTA TÉCNICA
                                            PERFORACIÓN POZO PRODUCTOR BRS-4

                1984-1987 Spartan
                Drilling Rig Manager
                    •   Involved in several turn- key wells
                    •   Trained all personnel in HSE and operations procedures

                1979-1984 Spartan
                Drilling Relief Rig
                Manager
                    •   Built 3200m diesel electric Rig 2E
                    •   Drilled and relieved for the duration of 3-year contract for B.P
                    •   Drilled on Polaris 10, 2 x 4200m wells for Pan Arctic in the High Arctic
                1976-1979 Sedco Drilling
                Roughneck- Driller
                    •   1 year in cement production at Inland Cement Edmonton

               Certifications & Licenses

                    •   Safety Management & Regulatory Awareness for Well Site Supervision
                    •   H2S Alive (Petroleum Industry Training Service)
                    •   Second Line Supervisors Well Control (Petroleum Industry Training Service)
                    •   Transportation of Dangerous Goods (TDG)
                    •   Workplace Hazardous Material Information Systems (WHMIS)
                    •   First Aid-CPR (St. John's Ambulance)
                    •   Ground disturbance
                    •   Incident Investigation & Analysis
                    •   Special oil-well operator
                    •   Emergency Spill response















































                                                                                                      233
               cpven.com
   241   242   243   244   245   246   247   248