Page 246 - Popuesta técnica pozo productor BRS-4_20211119_VF
P. 246
PROPUESTA TÉCNICA
PERFORACIÓN POZO PRODUCTOR BRS-4
1984-1987 Spartan
Drilling Rig Manager
• Involved in several turn- key wells
• Trained all personnel in HSE and operations procedures
1979-1984 Spartan
Drilling Relief Rig
Manager
• Built 3200m diesel electric Rig 2E
• Drilled and relieved for the duration of 3-year contract for B.P
• Drilled on Polaris 10, 2 x 4200m wells for Pan Arctic in the High Arctic
1976-1979 Sedco Drilling
Roughneck- Driller
• 1 year in cement production at Inland Cement Edmonton
Certifications & Licenses
• Safety Management & Regulatory Awareness for Well Site Supervision
• H2S Alive (Petroleum Industry Training Service)
• Second Line Supervisors Well Control (Petroleum Industry Training Service)
• Transportation of Dangerous Goods (TDG)
• Workplace Hazardous Material Information Systems (WHMIS)
• First Aid-CPR (St. John's Ambulance)
• Ground disturbance
• Incident Investigation & Analysis
• Special oil-well operator
• Emergency Spill response
233
cpven.com