Page 30 - SubTerra Engineering Corporate Profile - 2021 v2
P. 30
1984-1987 Spartan Drilling
Rig Manager
Involved in several turn- key wells
Trained all personnel in HSE and operations procedures
1979-1984 Spartan Drilling
Relief Rig Manager
Built 3200m diesel electric Rig 2E
Drilled and relieved for the duration of 3-year contract for B.P
Drilled on Polaris 10, 2 x 4200m wells for Pan Arctic in the High Arctic
1976-1979 Sedco Drilling
Roughneck- Driller
1 year in cement production at Inland Cement Edmonton
Certifications & Licenses
Safety Management & Regulatory Awareness for Well Site Supervision
H2S Alive (Petroleum Industry Training Service)
Second Line Supervisors Well Control (Petroleum Industry Training Service)
Transportation of Dangerous Goods (TDG)
Workplace Hazardous Material Information Systems (WHMIS)
First Aid-CPR (St. John's Ambulance)
Ground disturbance
Incident Investigation & Analysis
Special oil-well operator
Emergency Spill response
17