Page 8 - Core ERP
P. 8
MANUFACTURING
AND JOB COSTING
- Manufacturing process can be monitored stage wise
- Ability to handle multiple production lines in multiple stages.
- Batch wise production monitoring : each batch is assigned a job number and each job is monitored as it progresses through different stages. The total
raw material/ packing material consumption for a particular job is maintained. A job can be sample manufacturing , a repair or a bulk production line.
- The BOM/BOQ carries the recipe for a product. Total raw material/packing material /labour consumption per product.
- Supports substitute raw material items for BOQ/BOM.
- Ability to control the issuing of raw material stage wise: All raw materials will be issued against a particular job number stage wise. Enabling the system
to cross check with the initially estimated amounts. A privileged user’s authorization is required when issuing additional raw material.
- Monitor extra issues and out of the BOM issues against a particular job.
- Monitoring actual labour hours spent on a particular job.
- Calculate work in progress (WIP) stage wise.
- Provided assistance and maintain complete quality assurance procedures. REPORTS
- Monitoring damages at each stage.
- Monitor intermediate products and facility to transfer those to a new job/s - Production forecasting reports - Employee production
- Providing up to date and accurate information for production planning. - BOM/BOQ listing target reports
- Plan the production schedule with the sales forecast and re-order level status. - Estimated entry information - Job status listing
- Tracking actual vs. estimates for job profitability. - Complete job details (Stage Wise) - Job pro tability report
- Job tracking against a customer order or for in-house inventory. - Costing reports (Post/pre) - Raw material consumption
- Integration with General Ledger and Payroll - Production Reports (Detail/Summary) variance analysis
- Wide range of MIS reports, customizable according to user requirements. - Monthly production targets (Detail/Summary) - Job pro tability