Page 2 - Corrugation Management System_Neat
P. 2
Production Plan Daily Operation Work ow CORRUGATION MODULE REPORTS
Features
Pre – Costing Job Order
JOB COSTING 1. Raw material post costing 2. Job order vs invoice analysis
3. Order details for a customer
• Calculates unit cost per box Production Plan
• Costing facility for each part in the box 4.Production plan
FiNAC Corrugation Management System • Captures the block cost, die cut cost 5.Production vs delivery
• Option to calculate cost per box manually & automatically 6.Production job card
HARDWORKING • Best fit paper by using box type MATERIAL CONSUMPTION 7.Daily full / butt reel consumption
• Capturing price requisition
8.MRN vs consumption
• Get the best reel size for the job
9.Paper usage report
• Minimized paper wastage by using paper butt reels
• Pre costing recall option
• Post costing • Stores requisitions 10. Analysis of raw material allocation vs returns
11. List of material requests
• Daily startup wastage
SOFTWARE. QUOTATION MACHINES 12. Material issue note summary
13. Detail finished goods inventory
14. Outstanding finished goods inventory
• Facilitates to revise the quotation • Optimizing machinery usage by capturing machine maintenance details 15. Transfer note listing
• Machine maintenance related entries
16. Brand wise finished goods status
The FiNAC Corrugation Management system is distinctive. We created it that way. ORDER PROCESS STAGES 17. Customer wise brand analysis
18. Finished goods age analysis (qty / value wise)
• User define stages 19. Age analysis - finished goods stores
It is an exceptional Datamation Corrugation Management system, developed with a • Job breakdown quantity based on the delivery date wise • Stage transfer monitoring 20. Production completed pending transferred
focus to add value to your business. Our commitment to the corrugation industry is an • Previously selected jobs are marked according to the selected order • Daily production time sheet 21. Finished goods stock status
outcome of our extensive understanding of all processes and practical day-to-day • Track job status 22. Finished goods summary of transfer note
software requirements. GENERAL 23. Subcontractor finished good in out variance report
PLANNING PROCESS 24. Rejection report - stage wise
Software must be custom-made and ship shaped for businesses to excel • Integration of general ledger, inventory, accounts receivable 25. Subcontractor analysis report - customer wise
uninterrupted. With our wealth and knowledge of experience, we will ensure that your • Selecting order will be marked and order can be change anytime and accounts payable module either to FiNAC, SAP, Oracle etc 26. Stock information - dividers / partitions etc
software works hard for you. For over three decades we have continuously developed • Cumulative linear meter facilitates the decision making for the total machine Pre Costing 27. Brand wise job report
modules for a variety of sectors including the corrugation industry.
working strength for the day 28. Excess write off jobs
• Job forecast
It is time to explore Datamation’s FiNAC Corrugation Management system, created for • Allow to change job planning quantity, board quantity, sheet length, sheet width,
the corrugation industry. Take control. Dispatch Invoice
outs, reel size, up, linear meter and next process 29. Monthly AOD listing 38. Scheduled order listing
• Partial planning 30. Dispatched achievement report 39. Invoice report details - customer wise
• Sort the jobs and display as per requirement 31. Pending invoices (AOD raised) 40. Invoice price revision
• Printer machines are marked automatically in printer plan according to the previous 32. Finished goods dispatched detail 41. Sales returns / damaged quantity info.
stage decisions 33. Summary of canceled AODs 42. Job orders invoiced to a different customer
• Holidays can be marked in the calendar 34. Time sheet details
• Machine allocation 35. Available lorries according to
• Material allocation lorry capacity no
• Maintaining priority level job wise 36. Turn in lorries
• Production process line change 37. Off time lorries